My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-140
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 4:37:37 PM
Creation date
11/28/2011 2:26:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-140
Date
11/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment A, Scope of Services <br />City of San Marcos, Texas <br />SSES Basin 10 <br />Version 1.0 <br />PROJECT WORK PLAN <br />This project is a comprehensive collection system assessment of portions of Basin 10 serving the City of <br />San Marcos, Texas. The goals of the project are to identify system deficiencies and to develop a set of <br />solutions that will eliminate recurring sanitary sewer overflows in the aforementioned areas. The goals of <br />the project shall be accomplished through the performance of various tasks listed below: <br />Task 1 — Mobilization <br />This task provides for the deployment of equipment and personnel to the project area and <br />development of formal communication channels and data security protocols. Under this task, <br />ENGINEER will: <br />• Attend any scheduled Project Kickoff Meetings <br />• Develop and organize field task efforts <br />• Develop project status reporting formats <br />• Develop formal communication channels <br />• Develop field task maps and data collection formats <br />• Develop format for preparing and submitting invoices <br />• Develop channels for communication of City Action Items <br />• Prepare and submit a plan for security of project documents <br />Assumptions: None. <br />Required from Others: None <br />Deliverables: Attendance of the appropriate personnel at the Project Kickoff Meeting and <br />development of the items listed above for ENGINEER interface with the City of San Marcos. <br />Task 2 — Above Ground Physical Inspection <br />This task will be conducted to locate system assets for incorporation into the updated maps and <br />note evidence of potential problems with the sewer system. Limited smoke testing and electronic <br />line locating systems may be employed to locate manholes or trace out sewer trunk mains and <br />interceptors. The following will be accomplished during this task: <br />• Investigate the study areas for the purpose of documenting all system assets not shown on <br />the current system maps <br />• Evidence of sinkholes <br />• Evidence of line breaks <br />• Provide listing of system assets that are shown on the existing system maps, but not located <br />in the field <br />• Provide listing of system assets located by field crews but not shown on the existing system <br />maps <br />City of San Marcos, Texas Portions of <br />Basins 10 Assessment Page 1 <br />Project Work Plan <br />11/8/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.