My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-154
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2011 3:25:23 PM
Creation date
12/27/2011 2:35:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-154
Date
12/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID PHASE SERVICES FOR CHANNEL PROJECT <br />Loomis will assist the City during the bid phase of the contract with document <br />distribution, coordination of the pre -bid conference and bid opening, and other <br />assistance with questions and technical analysis throughout the bidding process. <br />Services will include: <br />• Preparation of appropriate technical specifications <br />• Preparation of detailed quantity take -offs and corresponding Bid Schedule <br />• Response to questions generated by prospective bidders <br />• Coordination / attendance at pre -bid meeting <br />• Preparation and issuance of addenda as required to ensure a competitive <br />bid <br />• Assistance in preparation of bid tabulation spreadsheets / summaries <br />• Submittal to COSM of conformed construction / contract documents <br />• Attendance at bid opening in accordance with applicable rules & <br />guidelines <br />Recommendation of award letter for Client <br />CONSTRUCTION PHASE SERVICES FOR CHANNEL PROJECT <br />Loomis will assist the City with contract administration during the construction phase <br />of the project. The City of San Marcos will provide construction inspection services. <br />The construction duration will be approximately 12 months. Services will include: <br />• Coordination with City inspectors and the contractor regarding start-of- <br />construction <br />• Technical support for and attendance at pre- construction meeting <br />• Review and feedback concerning product / vendor submittals and shop <br />drawings <br />• Periodic construction -phase site inspections for confirmation that <br />construction is proceeding in general compliance with the plans and <br />specifications <br />• Maintenance of an "issues list" identifying the date project related issues <br />become known, the person(s) responsible for solution(s), the date <br />solutions(s) will be provided, and documentation of final resolution of the <br />issue. <br />• Walk through at each Substantial Completion and coordination with the <br />Client, Inspectors, and Contractor to generate a Punch List for each Final <br />Completion <br />• Preparation of Record Drawings for each set of construction plans based <br />on as -built drawings from the Contractors along with notes from <br />Inspectors and Loomis's own periodic site inspections <br />• Preparation of final documents (including Concurrence Letters and <br />Construction Summaries) in support of final close -out for each phase of <br />the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.