My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-214
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2006 9:56:28 AM
Creation date
7/26/2006 9:50:57 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-214
Date
12/6/2004
Volume Book
159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RFP 24-057 <br /> <br />587 -0702 <br /> <br />I <br /> <br />SECTION 15950 <br /> <br />HVAC TESTING, ADJUSTING AND BALANCING <br /> <br />PART 1 - GENERAL <br /> <br />1.01 SUMMARY <br /> <br />A. This Section specifies the requirements and procedures for completed mechanical <br />system testing, adjusting, and balancing. Requirements include measurement <br />and establishment of the fluid quantities of the mechanical systems and <br />documenting adjustments as required to meet design specifications, and <br />recording and reporting the results. <br /> <br />B. Test, adjust, and balance the following mechanical systems: <br />1. Foul Air Collection Systems <br /> <br />, <br /> <br />C. This Section does not include: <br />1. Specifications for materials for patching mechanical systems; <br />2. Specifications for materials and installation of adjusting and balancing <br />devices. If devices must be added to achieve proper adjusting and <br />balancing, refer to the respective system sections for materials and <br />installation requirements. <br />3. Requirements and procedures for ductwork system leakage tests. <br /> <br />1.03 DEFINITIONS <br /> <br />A. Systems testing, adjusting, and balancing is the process of checking and adjusting <br />all components of the indicated systems to produce the design objectives. It <br />includes: <br />1. The balance of air distribution. <br />2. Adjustment of total system to provide design quantities. <br />3. Electrical measurement. <br />4. Verification of performance of all equipment and automatic controls. <br />5. Recording of adjustments and documenting blower speeds. <br /> <br />B. Test: To determine quantitative performance of equipment. <br /> <br />C. Adjust: To regulate the specified air flow rates from the specified treatment units <br />(e.g., reduce fan speed, throttling). <br />, , <br /> <br />D. <br /> <br />Balance: To proportion flows within the distribution system (submains, branches, <br />and terminals) according to specified design quantities. <br /> <br />I <br /> <br />E. <br /> <br />Procedure: Standardized approach and execution of sequence of work operations <br />to yield reproducible results. <br /> <br />15950-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.