My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-214
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2006 9:56:28 AM
Creation date
7/26/2006 9:50:57 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-214
Date
12/6/2004
Volume Book
159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RFP 24-057 <br /> <br />587 -0702 <br /> <br />F. Report forms: Test data sheets arranged for collecting test data in logical order <br />for submission and review. These data should also form the permanent record to <br />be used as the basis for required future testing, adjusting, and balancing. <br /> <br />G. Terminal: The point where the controlled fluid enters or leaves the distribution <br />system. For this system, terminals are considered to be the section of duct (or <br />blowers) located immediately upstream of the balancing dampers associated with <br />the treatment units connected to the Foul Air Collection System. <br /> <br />H. Main: Duct or pipe containing the system's major or entire fluid flow. <br /> <br />I. Submain: Duct or pipe containing part of the systems' capacity and serving two or <br />more branch mains. <br /> <br />J. Branch main: Duct or pipe serving two or more terminals. <br /> <br />K. Branch: Duct or pipe serving a single terminal. <br /> <br />1.04 SUBMITTALS <br /> <br />A. <br /> <br />Agency Data: <br /> <br />The PROPONENT will Submit proof that the proposed testing, adjusting, and <br />balancing agency meets the qualifications specified below. <br /> <br />B. Engineer and Technicians Data: Submit proof that the Test Engineer assigned by <br />the PROPONENT to supervise the procedures, and the technicians proposed to <br />perform the procedures meet the qualifications specified below. <br /> <br />C. Procedures and Agenda: Submit a synopsis of the testing, adjusting, and <br />balancing procedures and agenda proposed to be used for this project. <br /> <br />D. Maintenance Data: Submit maintenance and operating data that include how to <br />test, adjust, and balance the system. As a minimum record, all blower speeds, <br />damper settings, flows, and pressures required for balancing. <br /> <br />E. Sample Forms: Submit sample' forms, if other than those standard forms <br />prepared by the NEBB are proposed. <br /> <br />F. <br /> <br />Certified Reports: Submit testing, adjusting, and balancing reports bearing the <br />seal and signature of the Test and Balance Engineer retained by the <br />PROPONENT. The reports will be certified proof that the systems have been <br />tested, adjusted, and balanced in accordance with the referenced standards; are <br />an accurate representation of how the systems have been installed; are a true <br />representation of how the systems are operating at the completion of the testing, <br />adjusting, and balancing procedures; and are an accurate record of all final <br /> <br />15950-2 <br /> <br />I <br /> <br />, <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.