Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />earth, except that GBRA shall have the right to construct and maintain one (1) <br /> <br />pipeline drain valve assembly and cut off valve in their protective casements and <br /> <br />barriers as well as testing devices and corrosion prevention appliances on the <br /> <br />pipeline, and location identifying structures above and below the surface of the <br /> <br />earth within the permanent easement described in Exhibit "A". <br /> <br />3. GBRA, its successors and assigns, shall have the right of ingress and egress on, <br /> <br />over and along the area described in Exhibit "A" as a permanent easement for <br /> <br />any and all purposes necessary and incident to the exercise by GBRA of the <br /> <br />rights hereunder, including the right to enter the easement area to make <br /> <br />connections to said line, <br /> <br />GBRA, its successors and aSSIgns, shall have the right to install gates in <br /> <br />4, <br /> <br />GRANTOR'S fences which are located within the PROPERTY, and to maintain <br /> <br />locks on said gates. GRANTOR may construct other fences within the <br /> <br />easement, however, if said fences are built, GBRA shall have the right to <br /> <br />construct gates in said fences consistent with requirements of GBRA, its <br /> <br />successors and assigns, with respect to access, and GBRA may maintain locks <br /> <br />on said gates. <br /> <br />5, GRANTOR may construct roads and driveways across the PROPERTY so long <br /> <br />as they do not interfere with exercise of the rights granted to GBRA, its <br /> <br />successors and assigns herein, <br /> <br />6. During the period of construction of the said pipeline, GBRA may construct <br /> <br />such temporary fences as are required by its contractor or engineers and if such <br /> <br />fences are constructed, GBRA will allow access, and ingress and egress across <br /> <br />PIPELINE EASEMENT (Treated Water) 6/02 <br /> <br />Page 4 of 8 <br />