Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />will advise the City of data and information the Engineer needs to perform its services, and the <br />EngIneer will meet wIth CIty representatives at mutually convenient times to assemble tIllS data <br />and informatIOn. <br /> <br />1.1.7 The Engineer will assemble a Project team compnsed of the City's representatives and the <br />Engineer's representatives. The Engineer will meet with the Project team to set the design and <br />production schedule and parameters for all subsequent work, to verify the components withIn <br />which all Project participants must perform, and to identIfy all partIes and sIgmficant deadlInes <br />involved In the comprehensIve schedule strategy. Based on thiS Infonnatlon, the EngIneer \\ IiI <br />prepare a detailed schedule of its work for the Project addressing each component of the work to <br />be done, Indicating the points of involvement of all project partiCIpants. The EngIneer wIll <br />conduct weekly progress meetings between the Project team and the Contractor once the <br />construction contract is executed. <br /> <br />1.1.8 ASSISt the City in connection with the CIty'S responslbility for filIng documents reqlllfcd <br />for the approval of governmental authoritIes having jUrISdIction over the ProJect. <br /> <br />1.2 PHASE 1 - 30 % DESIGN SERVICES <br /> <br />During this phase of design services, the Engineer will: <br /> <br />1.2.1 Attend monthly progress meetings wIth the City to dISCUSS the status of the deSign phase <br />and obtain from the CIty any required InfOrmatIOn. <br /> <br />1.2.2 Review access locations to the Project site and determine which access locations must be <br />identified in the construction plans. <br /> <br />1.2.3 Identify the Project boundaries. <br /> <br />1.2.4 Develop honzontal and preliminary vertical alignments for the proposed gravity <br />wastewater interceptor. From the preliminary vertical alIgnment, provide the City wIth a flow <br />line elevation for the intersection of Post Road and Lime Kiln Road. <br /> <br />1.2.5 Locate and identify any utilIty conflicts within the Project area. <br /> <br />1.2.6 Identify and notify the City of any easement requirements for the Project. Easement <br />acquisition will be the responsibility of the City. <br /> <br />1.2.7 Provide field survey efforts. <br /> <br />1.2.8 CoordInate geotechnical Investigation wIth the CIty <br /> <br />1.2.9 ProvIde preliminary environmental assessment efforts. <br /> <br />1.2.10 Determine the design criteria for the wastewater gravIty interceptor, Including ultImate <br /> <br />2 <br />