Laserfiche WebLink
<br />I <br /> <br />development conditions, pIpe size, pipe material, minimum pIpe slopes, manhole spacing, and <br />other critena as required by the Texas Commission on Environmental Quality ("TCEQ"). <br /> <br />1.2.11 Identify any construction and/or traffic control Issues wIthin the Project area. <br /> <br />1.2.12 Prepare and submIt a Preliminary Engineenng Report ("PER") which summanzes 3 ()lJ/;) <br />design services of the Project for the City's review. <br /> <br />1.2.13 Prepare plan sheets for the Project. Engineer wIll draw the plan and profile sheets to a <br />honzontal scale of 1" = 20 feet and a vertical scale of 1" = 2 feet. <br /> <br />1.2.14 Perform an in-house quality control C'QC") and qualIty assurance CQC") revIew of the <br />plans as developed and revise the Project construction plans based on the In-house review. <br /> <br />1.2.15 Prepare and submit the plans for review to the City upon 30% completion. <br /> <br />1.2.16 Attend one Phase 1 review meeting with the City. <br /> <br />1.3 PHASE 1 - 60 % DESIGN SERVICES <br /> <br />During this phase of design services, the Engineer will: <br /> <br />I <br /> <br />1.3.1 Attend monthly progress meetings with the City to discuss the status of the deSIgn phase, <br />reVIew the schedules, obtaIn from the City any requIred information and revIew outstandIng <br />items. <br /> <br />1.3.2 Walk the Project's alignment to determine if any clanfications are required for the field <br />survey. <br /> <br />1.3.3 Incorporate City comments from Phase I design services. <br /> <br />1.3.4 CoordInate the completIOn of the envIronmental assessment. <br /> <br />l.3.5 Prepare the Technical SpecificatIOns Table of Contents and Incorporate CIty of AustIn <br />Standard Specifications pertaining to graVIty wastewater interceptors and appurtenances. <br /> <br />1.3.6 Prepare and submIt to the City the Engineer's opinion of probable constructIOn cost based <br />on 60% plan completion. <br /> <br />1.3.7 Perform an in-house QC/QA review of the plans as developed upon 60% completIon <br /> <br />1.3.8 Revise the construction plans based on the in-house QC/QA review. <br /> <br />I 1.3.9 Prepare and submit the plans fnr review to the City upon 60% completion <br /> <br /> <br />3 <br />