My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-155
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2006 11:08:09 AM
Creation date
7/28/2006 11:01:37 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-155
Date
9/13/2004
Volume Book
157
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />1.3.10 Attend one Phase 2 review meeting wIth the City <br /> <br />1.4 PHASE 3 - 90 % DESIGN SERVICES <br /> <br />During this phase of design services, the Engineer will: <br /> <br />1.4.1 Attend monthly progress meetings with the City to discuss the status of the deslgn phase <br />and obtain from the City any reqUIred information. <br /> <br />1.4.2 Incorporate City comments from Phase 2 design servIces. <br /> <br />1.4.3 Prepare the technical specifications for the Project. These techmcal specIficatIOns wIll <br />include, at a minimum, the construction plans, City of San Marcos DIVISIOn 1 specificatIons, <br />pertinent City of Austin standard specifications, any additional technical specificatIons and the <br />envIronmental assessment report. <br /> <br />1.4.4 Perform an in-house QC/QA review of the plans as developed upon 90% completIOn. <br /> <br />1.4.5 Revise the construction plans based on the in-house QC/QA reVIew. <br /> <br />1.4.6 Prepare and submit to the City the Engineer's opinion of probable construction cost based <br />on 90% plan completion. <br /> <br />1.4.7 Prepare and submit the plans for review to the CIty upon 90% completion. <br /> <br />1.4.8 Attend one Phase 3 review meeting with the CIty. <br /> <br />1.5 PHASE 4 - FINAL DESIGN SERVICES <br /> <br />Dunng the Final Design Phase, the Engineer will: <br /> <br />1.5.1 Incorporate City comments from Phase 3 design services and provide final plans and <br />profiles for the proposed improvements. The plan set will include but will not be lImIted to, <br />constructIOn details, pavement repair, traffic control, pavement markIngs, and temporary and/or <br />permanent erosIOn control. <br /> <br />1.5.2 Assist the City in the preparatIOn of constructIon contract documents USIng forms <br />supplied by the City based on the approved design development documents and any further <br />adJustments authorized by the CIty In the scope, qualIty or budget of the ProJect. These contract <br />documents WIll Include detailed plans and techmcal specifications identIfied 11l Subsection 1.4.3 <br />as required for the Project to be accurately bid and efficiently constructed. <br /> <br />1 5 3 Use ItS best professional judgment to create documents that comply wlth applicable <br />constnJction and development codes, local regulations and ordInances and other federal and state <br />regulatIOns which are known or whIch should reasonably be known to the EngIneer <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.