My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-155
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2006 11:08:09 AM
Creation date
7/28/2006 11:01:37 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-155
Date
9/13/2004
Volume Book
157
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />and consult with the City and provide progress reports and advice to the City In 'v\ l'llll1g, rOn\ ard <br />the City's Instructions to the Contractor unless (1) Engllleer IS unavallahle hy telephonic <br />communicahon or otherwise to issue Instructions necessary for the proper progress and <br />acceptance of work; (2) jeopardy to life and/or property exists; and/or (3) lack of InstructIOns <br />and/or unavailability of Engineer will result in, in City's opinion, harm to City, III whIch case <br />Instructions may be forwarded directly to the Contractor by the CIty; have authonty to act on <br />behalf of the City only to the extent provIded herein and in the constructlon contract documents <br />unless otherwise modified by WrItten instrument III accordance \\ Ith Section 12 I \11;- <br />instructions Issued directly by CIty to Contractor will be promptly communIcated to the Engll1eer <br />if the Engineer was unavaIlable at the tIme of the Issuance of the Instructions. <br /> <br />1.6.8 Conduct a pre-constructIOn conference WIth the Contractor, members of CIty's staff, <br />representatives of affected utility provIders, and federal and state agencIes haVIng Junsdlctlon <br />over the Project (including CIty inspectors) In order to establish constructlon schedules and to <br />identify key representatives of the partIes and lInes of communicatIon <br /> <br />1.6.9 Assist the City in ensuring that all applicable permIts and approvals have been obtaIned <br />from the appropriate agencies prIor to constructIOn. <br /> <br />1.6.10 Make on-sIte inspectIOns of the ProJect and attend progress meetlllgs at leasl monthly lo <br />ensure famIlIarity WIth the progress and quality of the work, to determllle If the \\or" IS <br />proceedIng in acceptable conformance WIth the constructIon contract documents, and to re\'IC\\ <br />the work with the City's designated representatives. On the basis of such on-site lllspectlons by <br />the Engineer, the Engineer will keep the CIty informed of the progress and qualIty of the work <br />through written status reports and through meetings WIth the CIty's representatIve, and Vv III also <br />be reasonably aVaIlable to perform site visitatIons at the specific request of the CIty by the next <br />business day after a request is made. <br /> <br />1 6.11 Not have control or charge of and will not be responSIble for constructIon mcans, <br />methods, techniques, sequences or procedures, or for safety precautIons and programs In <br />connection with the work, for the acts or omissions of the Contractor, subcontractors or any other <br />persons performIng any of the work, or for the failure of any of them to cany out the \\ork In <br />accordance with the construction contract documents unless such acts or omISSions arc due to thl' <br />neglIgence of the Engineer or are acts or omissions under the Engineer's control Ho\\ e\ er, <br />EngIneer will exerCIse ItS authOrIty on behalf of CIty In accordance hereWith and pdrtlcularly <br />dunng the constructIOn phase so that all work performed by the Contractor results In a ProJect <br />completed in accordance with the constructIon contract documents, and dUrIng any phase should <br />the Engineer become aware of the Contractor's utilIzation of means, methods, techlllques, <br />sequences and/or procedures of constructIOn whIch, In Engineer's OpInIOn, wIll not result In <br />completion of the Project in accordance with the construction contract documents; or which are <br />unsafe, EngIneer wIll immediately Inform the CIty and wIll take all necessary action \\ hlch the <br />Engineer IS authorized under thIS Agreement to take to correct the matter. <br /> <br />I 1 .6.12 At a II tI mes have acc ess to the work wherever it is in prep arati 011 11 r progress. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.