Laserfiche WebLink
<br />PROPOSED EXTEN~TON POLICIES <br />FOR \vL\TER AND ~: ..:;~R^GE tv1Jl.INS <br /> <br />I. NEW SUBDIVISIONS (In and Outside City) <br /> <br />A. Facilities Within Subdivision. The subdivider shall, at <br />his own cost, dedicate such right-of-way and construct <br />such storm sewers, drainage ditches, sanitary sewers, <br />water mains, and water lines of such a size as to adequately <br />serve the area being subdivided; however, if the City <br />should require the dedication of additional right-of-way <br />or the construction of storm sewers, drainage ditches, <br />sanitary sewers, or water mains of a size greater than <br />set out above, then, the City shall within one year after <br />date of approval of the final construction plans, provided <br />construction has been completed within such one year, <br />period and in accordance with approved construction plans, <br />reimburse the subdivider for any increased cost of such <br />facili ties. <br /> <br />B. Extension of City Facilities. Where it is necessary, in <br />order to properly serve the slIDdivision, that extension of <br />existing City utilities be made or that drainage facilities <br />be constructed outside the subdivision, which extension or <br />such facilities are here referred to as "off-site improve- <br />ments," the subdivider shall install such off-si te -i_mprovemen ts <br />of such a size as to adequately serve the area beinq subdjvided <br />at his own expense; however, if the City should require the <br />construction of off-site irnnrovements of a size greater th~lJ1 set <br />out above, then, the City shall within one year after date <br />of approval of the final construction plans, reimburse the <br />subdivider for any increased cost of such facilities. <br /> <br />II. EXTENSIONS WHEN NO REPLATTING OF PROPERTY IS NECESSARY <br /> <br />A. The City will pay for the first one hundred feet (100') <br />of any utility extension provided that: <br /> <br />1) the extension is made to serve at least one <br />dwelling and construction is begun on that <br />dwelling within ninety (90) days of the <br />completion of the extension. <br /> <br />2) the extension is of a size which is in confor- <br />mance with the City of San Marcos Master Plan <br />for utility development. <br /> <br />3) for extensions of more than one hundred feet <br />(100'), the developer pays the total cost <br />for line extension beyond the first one hundred <br />feet (100') for lines of U[) to eight inches (8"). <br />For lines of a size of more than eight inches <br />