Laserfiche WebLink
<br />2.2.4 Prepare a statement of the CONSULTANT'S <br />opinion of construction costs based upon the preliminary <br />designs developed. The CONSULTANT'S opinion of the <br />construction cost will be based upon prices available <br />at the time of preparation without consideration of any <br />inflationary increases in costs. The CONSULTANT will <br />not be required to guarantee the accuracy of the estimates. <br /> <br />2.2.5 Establish the scope of survey needed to <br />provide basic design information; and when authorized <br />by the OWNERS, to arrange for such work to be done, <br />for the OWNER'S account, as set forth in Article 5, <br />paragraph 5.3. <br /> <br />2.3 PHASE 2, DESIGN <br /> <br />Upon receipt of the OWNER'S written authorization <br />to implement Phase 2 and to proceed with final design and <br />preparation of contract drawings and specifications, the <br />CONSULTANT shall: <br /> <br />2.3.1 Establish the scope and advise the OWNER <br />of any soil and foundations investigation, or of other <br />special surveys and tests which, in the opinion of the <br />CONSULTANT, may be required for design; and when au- <br />thorized by the OWNER, arrange for such work to be done, <br />for the OWNER'S account, as set forth in Article 5, <br />paragraph 5.3. <br /> <br />2.3.2 Furnish to the OWNER, where required by the <br />circumstances of the assignment, the engineering data <br />necessary for applications for routine permits required <br />by local, state, and federal authorities. <br /> <br />2.3.3 Prepare detailed contract drawings on drafting <br />vellum or mylar film, and/or photographic reproducible <br />mylar film, and prepare the specification and Contract <br />Documents for construction of the PROJECT. <br /> <br />2.3.4 Whenever preparation of detailed plans lS <br />approximately 60% complete, the CONSULTANT shall: <br /> <br />-3- <br />