My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1982-002
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1982
>
Res 1982-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2006 1:26:25 PM
Creation date
7/31/2006 1:26:06 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1982-2
Date
2/8/1982
Volume Book
58
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(a) Furnish three (3) copies of all contract <br />drawings to the OWNER and two (2) copies <br />of all contract drawings to the Federal <br />Aviation Administration for preliminary <br />review and comments. <br /> <br />(b) Present a statement of the CONSULTA~T'S <br />opinion on construction costs, updated <br />to relate to the design developed at the <br />time. <br /> <br />(c) Attend a conference with representatives <br />of the OWNER to present and discuss the <br />details of the proposed improvements. <br /> <br />(d) Attend a conference with representatives of <br />the Federal Aviation Administration to <br />present and discuss the details of the <br />proposed improvements. <br /> <br />(e) Upon completion of the review conferences, <br />the CONSULTN~T will make approved modi- <br />fications and additions to the contract <br />drawings resulting from OWNER'S and the <br />Federal Aviation Administration reVlew <br />and the conference. <br /> <br />2.3.5 Furnish the OWNER five (5) copies of final <br />and approved contract drawings and specifications. <br /> <br />2.3.6 Prepare a detailed statement of the CONSULTANT'S <br />opinion of the construction costs based upon the final <br />design developed. The CONSULTANT'S opinion of construction <br />costs will be based on materials and labor prices prevail- <br />ing at the time of preparation. The CONSULTANT will not <br />be required to guarantee the accuracy of the cost estimates. <br /> <br />2.4 PHASE 3 - GENERAL ADMINISTRATION OF CONSTRUCTION <br /> <br />Upon approval by the OWNER and the Federal Aviation <br />Administration of the construction plans, specifications <br />and contract documents, Phase 3 of this agreement will <br />commence; and in accordance with the provisions of Article 7, <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.