My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2003-030
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2003
>
Res 2003-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2004 9:26:01 AM
Creation date
9/10/2003 1:43:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2003-30
Date
2/10/2003
Volume Book
151
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />sales. <br /> <br />1.3.4 From compiled customer use information, advise the City on whether its existing customer <br />classes and rate blocks are adequate or whether new customer class distinctions or rate blocks may <br />be warranted. Consultant will also use this information as a historical basis for projecting water <br />use by class and use block that is a key factor in calculating projected revenue. <br /> <br />1.3.5 Once this customer and utility production data is compiled and assessed, hold a workshop <br />with City staff to review the trends in customer use patterns and discuss potential implications on <br />the customer class definitions and rate designs. <br /> <br />1.4 TASK 4 - EXISTING FINANCIAL CONDITION OF THE UTILITIES <br /> <br />The Consultant will: <br /> <br />1.4.1 Using the analysis of recent customer data, review the adequacy of the City's existing <br />customer classes and rate structures from a design perspective as well as review the last two years <br />of audited financial information and the current year's budget and expenditures to date. <br /> <br />1.4.2 Upon completion of the review specified in 1.4.1 above, discuss this information with the <br />City's representative and identify any prospective changes in utility programs or capital expenditures <br />that may have near-term consequences in the current or pending fiscal year. The Consultant's <br />assessment of the existing fmancial condition of the utilities will address both current conditions, <br />as well as how the near-term future may affect the need for rate-setting action. <br /> <br />1.4.3 Address the financial viability of the combined water and wastewater utility fund as well as <br />the self-supporting aspects of each utility. <br /> <br />1.5 TASK 5 - DEVELOP FLEXIBLE FINANCIAL PLANNING MODEL <br /> <br />The Consultant will: <br /> <br />1.5.1 Work closely with the City to determine the current customer class and rate design needs, <br />as well as issues that may need to be considered in the future, such as building in the model the <br />capability to assess alternative customer classes, revised use block definitions. <br /> <br />1.5.2 Interview City staff about the current and pending informational needs to assure that the more <br />comprehensive model design has long-lasting value to the City and identify early-on whether the <br />model developed will be kept and operated within the City, with regard as to City staff that may need <br />training, what skills do they have, how will information for the model be transferred back and forth <br />from the utilities to the finance department. Subsequent to these staff interviews, Consultant will <br />develop a comprehensive model design utilizing its Integrated Planning Model (lPFM) approach <br />and meet with the City on a periodic basis to report the status of efforts, and seek any new direction, <br /> <br />HDRRate Design.wpd <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.