My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-038
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2006 1:44:25 PM
Creation date
8/7/2006 1:43:57 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-38
Date
2/21/2006
Volume Book
166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />Agreement. <br /> <br />1.1.4 No work under this Agreement will be subcontracted by the Engineer without prior <br />written approval from the City. Any work or services subcontracted under this Agreement shall <br />be specified by separate written Agreement and shall be subject to each provision of this <br />Agreement. <br /> <br />1.1.5 Any provisions in this Agreement pertammg to the City's review, approval and/or <br />acceptance of written materials prepared by the Engineer and/or its subconsultants, contractors, <br />and subcontractors in connection with this Agreement will not diminish the Engineer's <br />responsibility for the materials. <br /> <br />1.1.6 The Engineer will perform all of its services in coordination with the City. The Engineer <br />will advise the City of data and information the Engineer needs to perform its services, and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br /> <br />1.2 TASK 1 - DESIGN <br /> <br />For Phases 1 and 2 of the Project, the Engineer will: <br /> <br />1.2.1 <br /> <br />Prepare Project plans which include: <br /> <br />a) Cover sheet, location map and general note sheets. <br />b) Site plan design. <br />c) Streetscape design coordination <br />d) Drainage improvements. <br />e) Erosion and sedimentation control plan <br />f) ADA access improvements. <br />g) Construction sequencing. <br />h) Miscellaneous construction details. <br /> <br />For Phases 3 and 4 of the Project the Engineer will: <br /> <br />1.2.2 Prepare Project plans which include: <br /> <br />a) Cover sheet, location map and general note sheets. <br />b) Site plan design. <br />c) Bowl design coordination <br />e) Erosion and sedimentation control plan <br />f) Access improvements <br />g) Construction sequencing. <br />h) Miscellaneous construction details. <br /> <br />For Phases 1 and 2, and for Phases 3 and 4 subject to the availability of funds as discussed in <br />Section 1.1 of this Agreement, the Engineer will: <br /> <br />2 <br /> <br />Davcar Skatepark <br />
The URL can be used to link to this page
Your browser does not support the video tag.