My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-038
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2006 1:44:25 PM
Creation date
8/7/2006 1:43:57 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-38
Date
2/21/2006
Volume Book
166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />1.2.3 Assemble a Project team comprised of the City's representatives and the Engineer's <br />representatives. The Engineer will meet with the Project team to set the design and production <br />schedule and parameters for all subsequent work, to verify the components within which all <br />Project participants must perform, and to identify all parties and significant deadlines involved in <br />the comprehensive schedule strategy. Based on this information, the Engineer will prepare a <br />detailed schedule of its work for the Project addressing each component of the work to be done, <br />indicating the points of involvement of all project participants. The Engineer will conduct <br />weekly progress meetings between the Project team and the Contractor once the construction <br />contract is executed. <br /> <br />1.2.4 Assist the City in connection with the City's responsibility for filing documents required <br />for the approval of governmental authorities having jurisdiction over the Project. <br /> <br />1.2.5 Meet with the City's Project Manager periodically or as needed to update the City on the <br />progress of work. <br /> <br />1.2.6 Head the Project team and coordinate the integration of design, surveying, right of way <br />issues, traffic control, utility engineering, ADA compliance, permitting, and other services as <br />previously approved. <br /> <br />1.2.7 Assist the City in the preparation of construction contract documents using City forms <br />based on the approved design development documents and any further adjustments authorized by <br />the City in the scope, quality or budget of the Project. These contract documents will include <br />detailed plans and technical specifications required for the Project to be accurately bid and <br />efficiently constructed. <br /> <br />1.2.8 Use its best professional judgment to create technical documents that comply with <br />applicable construction and development codes, local regulations and ordinances and other <br />federal and state regulations which are known or which should reasonably be known to the <br />Consultant including those required under the ADA and Article 9102, V.A.C.S., Architectural <br />Barriers Act. The Engineer will be responsible for the submission of all plans and specifications <br />for the construction of this Project to the Texas Department of Licensing and Regulation for <br />review and approval prior to the time construction is set to begin in conformance with the <br />Architectural Barriers Act. The costs associated with the submission of plans for review under <br />the Architectural Barriers Act will be paid by the City. <br /> <br />1.2.9 Ensure that no reports, maps, or other documents produced in whole or in part under this <br />Agreement shall be the subj ect of an application for copyright by or on behalf of the Engineer. <br /> <br />1.2.10 Obtain approval from City inspectors of all technical plans and specifications necessary <br />for successful completion of the Project prior to allowing the construction contract to be let for <br />bid. <br /> <br />3 <br /> <br />Davcar Skatepark <br />
The URL can be used to link to this page
Your browser does not support the video tag.