My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-040
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2006 1:46:12 PM
Creation date
8/7/2006 1:45:46 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-40
Date
2/21/2006
Volume Book
166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. . <br /> <br />174. <br /> <br />PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br /> <br />This Agreement is made this the 21st day of February ,2006, between the City <br />of San Marcos, Texas ("City"), 630 East Hopkins, San Marcos, Texas 78666 and Bym and <br />Associates, Inc. ("Engineer"), P.O. Box 1433, San Marcos, Texas 78667 for the provision of <br />professional engineering services in connection with the Rio Vista Terrace Subdivision <br />Reconstruction (the Project). <br /> <br />The City and the Engineer agree as follows: <br /> <br />ARTICLE 1 <br />ENGINEER'S SERVICES AND RESPONSIBILITIES <br /> <br />1.1 STANDARDS OF PERFORMANCE <br /> <br />1.1.1 Engineer will be responsible for the proper, accurate and adequate design and <br />preparation of plans and specifications and other construction contract documents and for <br />construction administration for the Project. The Project generally consists of replacement of <br />water and wastewater mains throughout the Rio Vista Terrace Subdivision as well as roadway, <br />pedestrian, and drainage facility improvements. <br /> <br />1.1.2 The Engineer's Basic Services consist of the services described in Sections 1.2 through <br />1.4 and include normal civil engineering services. <br /> <br />1.1.3 The performance of all services by the Engineer in connection with this Agreement will <br />be by persons appropriately licensed or registered under State, local and Federal laws governing <br />their respective consulting disciplines. In performing all services under this Agreement, the <br />Engineer will use that degree of care and skill ordinarily exercised for similar projects by <br />professional Engineers who possess special expertise in the types of services involved under this <br />Agreement. The Engineer acknowledges that it has performed surveying services for the City <br />related to the Project, and that the Engineer is familiar with the conditions and construction <br />constraints at the Project site. <br /> <br />1.1.4 No work under this Agreement will be subcontracted by the Engineer without prior <br />written approval from the City. Any work or services subcontracted under this Agreement shall <br />be specified by separate written Agreement and shall be subject to each provision of this <br />Agreement. <br /> <br />1.1.5 Any prOVIsIons in this Agreement pertaining to the City's review, approval and/or <br />acceptance of written materials prepared by the Engineer and/or its subconsultants, contractors, <br />and subcontractors in connection with this Agreement will not diminish the Engineer's <br />responsibility for the materials. <br /> <br />1.1.6 Engineer will perform all of its services in coordination with the City. The Engineer will <br />advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br /> <br />1 <br /> <br />Byrn-Rio Vista Terrace Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.