<br />I <br /> <br />I <br /> <br />I <br /> <br />The City and the Engineer may agree to have the Engineer perform Bidding and Construction <br />Administration services for the Project. The services will be governed by the provisions of this <br />section and the compensation for the services will be defined in a Change of Services form <br />executed by the City and the Engineer prior to the Engineer beginning bidding and construction <br />administration work. <br /> <br />The Construction phase of this Project will commence with the award of the construction <br />contract and will terminate when the Project is accepted by the City. The Engineer will: <br /> <br />Bidding <br /> <br />1.4.1 Assist the City in the issuance of addenda (if any) following City's prior approval. <br /> <br />1.4.2 Assist the City in obtaining bids, tabulating bids, preparing bid tabulation forms, and in <br />awarding the contract for construction following the City's approval of the construction contract <br />documents and of the latest detailed final cost estimate ofthe Project. <br /> <br />1.4.3 Assist the City in reviewing the Statement of Bidder's Qualifications, financial <br />statements of bidders, lists of bidders' proposed subcontractors, and all other documents required <br />to be submitted with the bids. <br /> <br />1.4.4 Make a written recommendation to the City regarding award of bid; and assist the City in <br />conducting a pre-bid conference and answer all questions of prospective or potential bidders and <br />City's staff and make all necessary clarifications and interpretations of the construction contract <br />documents. <br /> <br />1.4.5 Have no authority to issue a Notice to Proceed to any Contractor. <br /> <br />Construction Administration <br /> <br />1.4.6 Provide administration of the construction contract as set forth in the construction <br />documents unless otherwise provided in this Agreement and incorporated in the construction <br />contract documents. Engineer will not pursue a course of conduct which might jeopardize any of <br />the City's rights hereunder. Minor deviations from the construction contract documents that do <br />not affect the validity of performance bond(s) are permitted. <br /> <br />1.4.7 Be a representative but not an agent of the City during the construction phase, and advise <br />and consult with the City and provide progress reports and advice to the City in writing; forward <br />the City's instructions to the Contractor unless (1) Engineer is unavailable by telephonic <br />communication or otherwise to issue instructions necessary for the proper progress and <br />acceptance of work; (2) jeopardy to life and/or property exists; and/or (3) lack of instructions <br />and/or unavailability of Engineer will result in, in City's opinion, harm to City, in which case <br />instructions may be forwarded directly to the Contractor by the City; have authority to act on <br />behalf of the City only to the extent provided herein and in the construction contract documents <br />unless otherwise modified by written instrument in accordance with Section 12.1. Any <br />instructions issued directly by City to Contractor will be promptly communicated to the Engineer <br /> <br />4 <br /> <br />Byrn-Rio Vista Terrace Agreement <br />