My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-061
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2006 3:05:22 PM
Creation date
8/8/2006 3:03:26 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-61
Date
4/4/2006
Volume Book
166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />requested documentation or information requested within this RFP is provided to the City. <br /> <br />M. SYSTEM APPROVAL: Upon completion of survey, the City and CCG will submit a I <br />letter to proponent detailing any items that may require further attention by proponent prior <br />to acceptance of services. Any changes and/or corrections which are found to be required <br />as a result of this testing will be completed by proponent within two weeks of receipt of <br />letter from the City and CCG outlining items required for completion prior to acceptance. <br />Final acceptance is contingent upon satisfactory proponent demonstration of completion of <br />all installation requirements. Upon successful completion of all items, the City and CCG <br />will issue a letter of acceptance stating specific acceptance date, which will be governing <br />date for all related RFP acceptance period items, and will be approval for final <br />payment by client to proponent. <br /> <br />N. NOTIFICATION: Prior to commencing work, the successful proponent will notify the <br />City representative prior to commencing work. Once installation has commenced, the <br />successful proponent's technician will not leave the installation without contacting the City <br />representative and informing them of status of job, reason for leaving, and expected return. <br /> <br />O. MAINTENANCE AND ONGOING SERVICE: The successful proponent will maintain <br />all on-site, cable, materials, and equipment for the duration of the contract. Equipment <br />includes Decoder Service Unit ("DSU")/Coder Service Unit (s) ("CSU"), Drop & Insert <br />Muxes, and any other equipment needed for the total turnkey installation of service(s). The <br />successful proponent will be responsible for and will incur all costs for any material, cable <br />or equipment repairs. If it is documented during the contract period that any specific I <br />equipment, component or cable requires maintenance deemed excessive by manufacturer <br />standards, proponent will replace equipment or cable at no cost to the City. <br /> <br />The successful proponent will provide all maintenance at no cost to the City at the City's <br />location specifically related to on-site equipment and cable installed by the successful <br />proponent. All travel expenses incurred in providing client on-site maintenance will be the <br />sole responsibility of the proponent. The successful proponent will provide all maintenance <br />test equipment, replacement parts, and qualified personnel to maintain and service client <br />equipment and cable. The successful proponent is responsible for any costs incurred by <br />the City in an attempt to enforce these terms, inclusive of court costs and attorney fees, <br />should the proponent fail to honor. <br /> <br />P. SYSTEM FAILURES: The following outlines the guidelines, procedures, and definitions <br />required in the event of system failures. The successful proponent will be responsible for <br />periodic notification of City's representative concerning all phases regarding status of <br />system repair. The successful proponent will provide a system certified technician (the <br />"technician") for all system failures defined below. If the successful proponent or its <br />technician are required to leave the City site for any period prior to completion of repair, the <br />City's representative will be notified of the reason for departure and the estimated time of <br />return. If the proponent is delayed, proponent will notify the City's representative. <br /> <br />a. A Major Service Failure is defined as any of the following: <br />- 8 - <br /> <br />I <br /> <br />1. Maior Service Failure: <br />
The URL can be used to link to this page
Your browser does not support the video tag.