My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-061
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2006 3:05:22 PM
Creation date
8/8/2006 3:03:26 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-61
Date
4/4/2006
Volume Book
166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />a. Equipment: The proponent is responsible for installing and maintaining all <br />miscellaneous equipment needed for Point to Point T1 services. The <br />proponent will provide the City with the installation requirements; including I <br />power, space, etc. for all equipment. All equipment will remain the property of <br />the proponent and will be maintained for the duration of the contract. All <br />installation costs for equipment will be included 0 Proposal Response Form <br />(Attachment "A"). <br /> <br />b. Cable: <br /> <br />1. Exterior/Interior Cable: The proponent is responsible for completing all <br />exterior and interior cabling requirements. All installation and material costs <br />will be included on Proposal Response Form (Attachment "A"). <br /> <br />2. Tie Cable: The proponent is responsible for completing all required tie <br />cabling. All installation and material costs will be included on Proposal <br />Response Form (Attachment "A"). <br /> <br />c. Lightning Protection: The proponent is responsible for all lightning protection <br />required by the services provided within this RFP. All equipment will remain the <br />property of the proponent and will be maintained for the duration of the <br />contract. All installation and material costs will be included on Proposal <br />Response Form (Attachment "A"). <br /> <br />3. Customer Service Requirements: Please provide your customer service number for 1 <br />point to point T1 service and state your hours, and days, of operation, by a LIVE <br />person. What happens to callers when customer service number is not <br />"MANNED"? State the Location of your customer service operation. <br /> <br />5. OPTIONAL SERVICES OFFERINGS <br /> <br />If proponent has optional services offerings that would benefit the City; which have not <br />been addressed within this RFP, provide detailed information within this section. Your <br />response will be provided in a professional manner and will detail the benefits, as well as, <br />costs to the City. This section may be your only method of introducing offerings that have <br />not been discussed. Let us know of your thoughts, ideas, and solutions. <br /> <br />Detailed pricing information is not required in this section; however, estimated cost must be <br />within 10% for validity and acceptance within the scope of this proposal. All final costs will <br />be itemized and negotiated should the City desire to implement any of these proposed <br />services. The City is not bound or required to respond to, or address, with proponent any <br />proposed Optional Services Offerings. <br /> <br />I <br /> <br />- 14 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.