My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2003-040
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2003
>
Res 2003-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2003 3:39:34 PM
Creation date
9/12/2003 9:30:09 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2003-40
Date
2/24/2003
Volume Book
151
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
San MarcosWastewater Masterplan <br />PBS&J <br />Austin, Texas <br />JanuaW 31,2003 <br /> <br /> Table 1 <br />Estimated Quantities and Cost <br /> <br /> Unit Cost Estimated Total Cost <br />Task Task Description Unit <br /> ($) Quantity ($) <br />1. Preparatory Work and Mobilization Lump <br /> Sum $2,900.00 1 $2,900.00 <br />2 Installation, Removal and Maintenance of Flow Meter <br /> Monitors and Rainfall Gages Day $69.50 900* $62,550.00 <br />3. Flow Monitoring, Data Management, Engineering Each $1,750.00 15 $26,250.00 <br /> Evaluation and Report <br /> Project Administration, Management, Supervision, and Each $3,200.00 1 $3,200.00 <br />4. Quality Assurance <br /> Totalw/o Optional Tasks $94,900.00 <br /> 5. I Relocation of Flow Monitoring Equipment I Each t $1,200.00 I 10 $12,000.00 <br /> Total w/ Optional Tasks $106,900.00 <br /> Note: Estimated Quantity for Task 2 is developed by multiplying the number of flow monitors (15) by 60 days <br /> Extended Metedng Cost (as required) is $62.50 per meter per day <br /> <br />I/Engineering/San Marcos/Flow Monitoring ProposaLdoc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.