Laserfiche WebLink
1.5 ADDITIONAL SERVICES <br /> <br />1.5.1 The services included in this Agreement comprise the first phase of the necessary services <br />for the completion of this Project. Upon completion of the first phase, Engineer will submit a <br />detailed scope of services and fee estimate for additional phases to the City and obtain the City's <br />authorization before initiating any additional services. <br /> <br />1.5.2 Each material change (deletion or addition) in the services to be provided by Engineer must <br />be authorized by the City on the Anthorization of Change in Services form attached to this <br />Agreement as Attaclunent B. Compensation for additional services will be in addition to that <br />specified for Basic Services in accordance with Section 4.2 of this Agreement. The approval of the <br />City's governing body is necessary for all additional services the compensation for which exceeds <br />$25,000. <br /> <br /> ARTICLE 2 <br />THE CITY'S RESPONSIBILITIES <br /> <br />The City will: <br /> <br />2.1 Provide full information to and furnish the Engineer with copies of documents, data and <br />information in the City's possession needed by the Engineer at the Engineer's request, including the <br />following items: <br /> <br />One reproducible copy of a map of the existing sewer system showing sewer lines and <br />manholes. <br />Lift station data, including record drawings, pmnps and pump operation information. <br />Population and water consumption data for the study area, existing and futm'e (developed <br />as part of the water master plan process). <br />Maps of sewer service area, both existing and projected future. <br />Available digital image/CAD files of as-built construction plans of wastewater lines. This <br />information will be provided on CD or to a ftp site. <br />Construction plans for triple-bmxel siphons at the San Marcos River. <br />Information on interceptor projects ctnxently identified in the City's CIP (planned <br />alignments, sizes). <br />Digital contom' map (dgn or ArcView format). <br />Cun'ent land use and zoning GIS (in ArcView format). <br />Digital aerial photo(s). <br />Wastewater Treatment Plant daily flow records for the last 5 years. <br /> <br />2.2 Make available to the Engineer for review and copy, SCADA records of lift stations <br />monitored by SCADA. Engineer understands that "hard copy" or digital copy of SCADA data is not <br />available. <br /> <br />PBS&J.wpd 4 <br /> <br /> <br />