My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2003-040
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2003
>
Res 2003-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2003 3:39:34 PM
Creation date
9/12/2003 9:30:09 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2003-40
Date
2/24/2003
Volume Book
151
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.3.5 Review GSWW, Inc. flow monitoring data and perform analysis of inflow versus rainfall <br />imensity (Q vs I) for rain events. <br /> <br /> 1.3.6 Deliverables: Deliver flow data reports at approximately 2-week intervals depending on <br />rainfall events and downloading. <br /> <br />1.4 TASK 3 - DATA ACQUISITION AND REVIEW <br /> <br />The Engineer will: <br /> <br />1.4.1 Available Data. Available data will be provided by the City in accordance with Article 2. <br />1.4.2 Review lift station data furnished by City- capacity ratings, SCADA run time. <br /> <br />1.4.3 Determine extent of the collection system to model-pipes and lift stations (10" and larger <br />pipes, plus smaller pipes to connect modeled lift stations or otherwise hydraulically significant pipes; <br />estimated to be at least 700 pipes). <br /> <br />1.4.4. Cross-reference manhole numbers between existing City (B&V) model (300 pipes) and <br />Engineer's model (using GIS manhole ID's provided by City). Engineer will transfer existing model <br />elevations to manholes for Engineer's model. <br /> <br />1.4.5 Identify remaining manholes that need elevation data. and submit map (digital and hardcopy) <br />to City with manholes/pipes highlighted for construction plan set identification by City. <br /> <br />1.4.6 Review construction plans provided by City to obtain manhole elevations for the model. <br />1.4.7 Check pipe and lift station data for uncertainties, discrepancies, and omissions. <br /> <br />1.4.8 Review contour map overlay on collection system and provide list of questions to City and <br />coordinate for resolution of questions. <br /> <br />1.4.9 Determine number of manhole elevations missing which will be acquired by smweying <br />(surveying is not included under this Agreement). <br /> <br />1.4.10 Review lift station construction plans to determine additional data needed for flow <br />monitoring and modeling. <br /> <br />1.4.11 Review construction plans for San Marcos River siphon. <br /> <br />1.4.12 Review available data as basis for existing and future design flows. Data to be reviewed <br />includes: land use and zoning GIS, aerial photos, population projections, water master plan data <br />(APAI, 2003), and water billing data. <br /> <br />PBS&J.wpd 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.