Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />-. <br /> <br />" <br /> <br />EXHIBIT liB r' <br /> <br />CONTAACTOR'S AGREEMENT <br /> <br />THIS AGREEMENT, made this <br />the MIS SOU HI -KANSAS -TEXAS RAILROAD <br />in called IIRailroad,1I and <br />herein called "Contractorll; <br /> <br />day of , 1980, by and between <br />OOMPANY, a Dela\'lare Corporation, First Party, here- <br />, Second party, <br /> <br />VITTNESSETH: <br /> <br />1. By Agreement dated May 15, 1980, Railroad granted to the City of san Marcos, <br />a Municipal Corporation, hereinafter called IlLincensee,,1I a Construction Agreement <br />giving permission to Licensee to enter upon Railroad's right of way to reconstruct <br />Patton Street, hereinafter referred to as 1I~'I!ork, II at milepost M-986.92 in San Marcos" <br />Hays County, Texas. <br /> <br />2. Li..censee has entered int 0 a Contract with Cont ractor to perform that portion <br />of the above described v\'ork across Railroad's right of VlaY, and <br /> <br />3. Contractor has requested Railroad to permit it to enter upon the right of way <br />of Railroad for the purpose of performing said Work, and Railroad is agreeable thereto <br />under the following terms and conditions; <br /> <br />NOW, THEREFORE" it is mutually agreed by and beb/een Railroad and Contractor as <br />follows: <br /> <br />1. Railroad hereby grants permission to Contractor to enter upon Railroad's <br />right of way for the p~ose of performing the work at the location described above; <br />however; before entering upon Railroad's right of way, Contractor will give to Rail- <br />road's roadmaster, D. J. Bell whose address is P. O. Box 9035, San Antonio, Texas <br />78204" telephone number 512-225-1521, at least five (5) days' advance notice of any <br />work to be perfonned upon Railroad's property. <br /> <br />Contractor shall notify Railroad's roadmaster the date said Nork is completed. <br />Upon completion of said iJork, Contractor shall promptly remove from Railroad's property <br />all tools, equipment and materials placed thereon by the Contractor and Contractor's <br />agents. Contractor shall restore said property to the same state and condition as when <br />Contractor entered thereon, and shall leave said property in a clean and presentable <br />condition. <br /> <br />2. Prior to conunencement of any Work upon or adjacent to Railroad's property <br />under said Contract, Contractor shall provide Railroad a certified copy of an insurance <br />policy, terminable only after ten (10) days' notice to Railroad, covering the operations <br />of Contractor in connection with said ",Vork, with limits of liability in said policy not <br />less than $500,OCO for injury to or death of one person in anyone accident, and <br />$1,000,000 for injury to or death of more than one person in anyone accident, with an <br />aggregate property damage of $500,000, whic h policy shall insure the contractual lia- <br />bility of Contractor under this Agreement. Alternatively, Contractor may provide Rail- <br />road with a Railroad Protective Policy having the same limits. <br /> <br />3. Said 'ifork shall be performed in accordance with plans and specifications <br />approved by Railroad and in such a marmer, and at such times, as shall not endanger or <br />interfere with, hirrler, interrupt, or delay the operation of Railrcad's trains, engines, <br />