Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />, <br /> <br />at any time prior to starting work on said project, cr durine the pY'Ocresa of suid <br />work, an emergency arises a. t any other location on Railroad Company I s main line vtlich <br />req.l:"t"!33 it to lWG its forces or equipmalt a:..:signed to said grade crossing project. <br />tor work in cotU10ction '.Iith anc! e:J~r'::el:'cy J TIaiL""Ou.d ComlJd..'1.Y s.~all hllve the right to <br />atop ilor}: on the gadc cr06sing project until such ti.ma as i'.ork on said emergency <br />situation has been performed. <br />10. City asswnss the entire responsil:D.li ty for the construction and ~i.ntenance <br />of the work to b~ JClne by it un ."id project, including appronches, pavement and drain- <br />age racil1tie~J 3.n<1. nothing heroin shall be con:;;tl'uod 1;,0 place upon the Railroad CompWV' <br />any manner of liability tor injury to or death ot persona or for damage to or loss of <br />property, arising from or in cm~r ma.nner connected with the construction, maintenance <br />or use of said project, including approaches, pavement and drainage facilities located <br />upon Railroad Company's property and right 01' way exc~t that Railroad CcmpaIW accepts <br />responsibility tor the na1ntenanoe of the 32 toot prefab timber crossing a.t city's <br />expense. <br />11. Nothir.g herein contained sha.ll prevent Railroad COll"ilnny at any time or from <br />time to time from changing, multiplying, relocating, maintaln5.ng or abandoning any of <br />its tracks across or upon said grade crossing. <br /> <br />-4- <br />