My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1980-024
San-Marcos
>
City Clerk
>
02 Ordinances
>
1980 s
>
1980
>
Ord 1980-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 9:15:38 AM
Creation date
8/18/2006 9:14:51 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amendment
Number
1980-24
Date
6/4/1980
Volume Book
53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />., <br /> <br />" <br /> <br />title of aaid fl&.sher protection to Rb.i1road Co.mpSI\}', dud Railroad Comp8l\Y will then <br />maintain said flasher protection at its sole e.xpenae. <br />6. City will require its employees or its cort.ractor, during the com truction <br />of sun project, to perfonr.. 614011 work in a ma1IDer as will not interfere with the <br />operation of Railroad Company's track and in such manner as will permit Railroati <br />Canpan,y to operate ita trains with a minimum delay. Railroad Company shall desig- <br />nate the time for the work to be done on the crossing uf the railroad right of way, <br />including the roadbed, curb and gutter, and paving, una the duration of time allowed <br />for the main line to be open. Railroad Company reserves the right to maintain an <br />inspector on the job at all times, and upon completion of work on said project, <br />Railroad Company and Ci\,y will make a final inspectiC41. of same. City agrees that <br />it will not accept said project Wltil such joint, L...ru..tl inspection reveals that the <br />'l"lork to be done by each party has been constructed in accordan~ wi.th said plana and <br />speciticatl ans. <br />7. Upon the completion of joint acceptance of the said project by City and <br />Railroad Company, this .ir13trwnent shaL. hdve the effoct of and shall operate as a <br />conveyance of the titlG of the 32 foot prefab timber crossing to Railroad Company. <br />Railroad Company will maintain, at City's expense, 'r.hat pnrt of sci.d pro ject conveyed <br />herein to it. As a poI"tion of the cmsUleration fot' this agreement. city agrees <br />that it will not levy any assessmmts against Railroad Company or its property for <br />any portion of the cost of the present projected. construction" improvement, or main- <br />tenance of said street or any of the facilities hereinabove provicJad. <br />8. City agrees that in its contrCiCt for drainage work and street paving, it <br />will require its contractor, priol' to starting an~- work thereurder" to execute a <br />Contractor's Agreement:.~ in form uttached as Exilibit "BlI. <br />9. City agrees to give Railroad Company's Chief Engineer at least ten (10) <br />days I written notice prior to starting work on t.he drainage and/or street pavUlg, <br />such time being required by Railroad Company to assemble forces for said work. If, <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.