My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1980-039
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1980
>
Res 1980-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:38:56 AM
Creation date
8/18/2006 11:03:14 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1980-39
Date
6/16/1980
Volume Book
53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5 . <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />-5- <br /> <br />Constiuction Phase <br />a) Make periodic visits to the site to observe <br />as an experienced and qualified design pro- <br />fessional the progress and quality of the <br />executed work, and to determine in general <br />if the work is proceeding in accordance with <br />the plans and specifications; Engineer shall <br />not be required to make exhaustive or continu- <br />ous on-site inspections to check the quality <br />or quantity of the work. Engineer shall not <br /> <br />be responsible for the means, methods, tech- <br /> <br />niques, sequences or procedures of construction <br /> <br />selected by the contractor or the safety pre- <br /> <br />cautions and programs incident to the work of <br /> <br />the contractor. Engineer's efforts will be <br /> <br />directed towards providing assurance for the <br /> <br />owner that the completed project will conform <br />to the plans and specifications, but Engineer <br />shall not be responsible for the failure of <br />the contractor to perform the construction <br />work in accordance with the plans and specifications <br /> <br />and the contractor's contract, as long as Engineer <br /> <br />shall report to the City any deficiencies in the <br />work actually debected by Engineer. During such <br />visits and on the basis of on-site observations, <br />Engineer shall consult and advise with City during <br />construction and submit to City periodic reports <br />on progress of construction when such reports <br />are requested by City. <br />b) Review and approve Shop Drawings (as that term <br />1S defined in the Standard General Conditions <br />of the Construction Contract National Society <br />of Professional Engineers document 1910-8, 1974 <br />edition) and samples, the results of tests and <br />inspections and other data which any contractor <br /> <br />is required to submit, but only for conformance <br /> <br />with the design concept of the Improvements and <br /> <br />compliance with the information given in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.