My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-020
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2012 9:51:31 AM
Creation date
3/13/2012 8:52:37 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-20
Date
3/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Assign Hydraulic Information to Model <br />FNI will utilize pipe material and age data to assign Mannings "N" values to all pipe segments in <br />the model. In addition, FNI will populate hydraulic information for siphons and other special <br />structures, such as junction boxes, weirs, and split manholes. <br />Incorporate Detailed Lift Station Data <br />Lift Station and Force Main as -built information provided by the City will be entered into the <br />model. FNI will review as -built drawings and operational data provided by the City to obtain <br />physical data (wet well dimensions, pump curves, force main material and pressure rating, etc.) <br />and develop initial controls for the model. Identify missing lift station data needing field <br />verification including physical dimensions, pump performance data and any missing force main <br />information. <br />Sewer Basin Delineation and Subcatchment Generation <br />Review and update sewer basin delineation using GIS Shapefile and ground contour mapping. <br />Develop sewer subbasin delineation representing meter areas and geographical areas within <br />each sewer basin. Generate subcatchments for each sewer subbasin showing which areas feed <br />into each sewer manhole using Thiessen polygons within their respective flow meter basins. <br />FNI shall prepare detailed mapping and meet with the City to review the sewer basin, subbasin <br />and subcatchment mapping results. <br />Conduct Data Flagging & Prepare Geodatabases for Submittal to City <br />FNI will assign data flags for all sources of the model physical links, nodes, flow files and <br />geodatabases and provide to City GIS personnel to allow updating of GIS to reflect corrected <br />information for all 12 -inch and larger sewer lines. Data flagging will be provided with final GIS <br />submittal to the City. FNI will provide a key showing data flagging sources. <br />Model Development Technical Memorandum (TM -2) <br />FNI will prepare and submit five (5) copies of a technical memorandum, TM -2, summarizing the <br />process used for model development.. <br />Workshop #1: Review Flow Monitoring (TM -1) and Model Development (TM -2) <br />FNI will meet with City to discuss results of the flow monitoring. Wastewater model <br />development will also be discussed. City comments will be solicited and addressed. <br />TASK D: WASTEWATER SYSTEM MODEL CALIBRATION <br />D1. Existing Wastewater Flow Data Importation into the Model <br />Geocoded water billing data will be used to assign flows to manholes in the model. Major <br />customers will be located and allocated as a point loading. <br />WW Master Plan Engineer Services (Engineering Services) — February 2012 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.