Laserfiche WebLink
CITY OF SAN MARCOS ELECTRIC RULES AND REGULATIONS <br />levels, tight voltage regulation, minimum line noise and other special <br />requirements shall be the responsibility of the customer. The customer may be <br />required to share in a portion of the estimated construction cost for extending a <br />service where such service is not normally provided, or for additional meter or <br />transformer installations to provide separate electric service such as to x -ray <br />machines. <br />2. INTERMITTENT LOADS- The city reserves the right to require that the <br />customer furnish and install any suitable or special equipment necessary to <br />reasonably limit the adverse effects created by customer -owned equipment such <br />as process furnaces, arc welders, resistance welders, and large motors. <br />3. EXCESS CONSTRUCTION COST DETERMINATION - In a situation <br />where a customer requires electrical facilities in excess of that normally furnished <br />by the City, the customer may be required to pay the city for the excess <br />construction cost. The City, at its sale option, may reduce such payment when the <br />estimated annual revenues (derived from base rates, exclusive of the fuel) <br />anticipated from the proposed facility generate the required margins to cover the <br />total cost of constructing the requested facilities. <br />G. SUBDIVISION DEVELOPMENTS, MOBILE HOME PARKS, AND <br />MOBILE HOME SUBDIVISIONS <br />The city will extend overhead service into a new subdivision development only after the <br />subdivision is platted and filed for record in the county in which it is located, and if <br />located in an incorporated city, filed and approved by the appropriate city officials. The <br />plat shall have adequate easements dedicated for the construction of electric utility lines, <br />and such easement shall allow access for the construction of electric lines to all lots and <br />allowing room for anchors, guys, and other appurtenances. <br />At the request of the developer, the City may, at its option, construct facilities within a <br />platted subdivision provided the developer advances the total cost of such facilities. <br />Otherwise the City will extend primary lines to serve individual customers as provided for <br />under Appendix A. Section A. <br />H. TEMPORARY SERVICES <br />Extensions required to serve customers on a temporary basis will be installed only if the <br />applicant for temporary services pays the City, in advance, the standard cost of installing <br />and removing all facilities expressly required for such temporary service. <br />In situations where a temporary service is required for construction purposes and such <br />temporary line extension results in a permanent meter upon completion of the <br />construction, the City will extend such temporary service which contributes to a <br />permanent electric service, at its option, under the appropriate rule for permanent <br />extensions. <br />20 <br />