ATTACHMENT A — SCOPE OF SERVICES <br />CITY OF SAN MARCOS <br />HARMONS WAY— OAKRIDGE SUPPLY LINE <br />Alan Plummer Associates, Inc., (APAI) will provide design, bidding, and construction phase services for <br />approximately 10,350 linear feet of 12 -inch water line and 3,650 linear feet of 8 -inch water line. The 12- <br />inch line will extend southerly along Hunter Road from its intersection with Centerpoint Road to the <br />intersection of Hunter and Harmons Way. The line will continue in Harmons Way to the Oak Ridge well <br />site. Completion of this line will allow the City to provide surface water to the ground storage tanks at <br />the Oak Ridge site, allowing the Oak Ridge wells and treatment system to be taken off line. The 8 -inch <br />line will replace existing lines within Harmons Way that provide service to residents along this roadway. <br />These improvements are important to the City because the manufacturer of the membranes used at the <br />Oak Ridge site has indicated that they are no longer manufacturing the membranes. Due to the extent <br />of the work included in Harmons Way, it is anticipated that the street surface will require milling and a <br />complete overlay following the installation of the water lines and service lines. <br />The City has had a portion of the improvements designed previously. It is anticipated that the City will <br />be able to provide the AutoCAD background files for this portion of the project so that the <br />improvements through this area can be redesigned as necessary to be incorporated into an overall <br />improvement project. It is anticipated that the survey will not need to be redone through this area. <br />The following specific Scope of Work will be completed for this project. <br />SCOPE OF WORK <br />Preliminary Engineering Phase <br />Task 1 — Review Existing Design for Quail Run Phase II - APAI will review the existing design documents <br />provided by the City for the portion of the alignment between Hunter /Posey and the Oak Ridge pump <br />station. APAI will conduct a site visit to identify whether the drawings still accurately reflect the <br />conditions on the ground. APAI will review the status of the easement acquisition process for tracts <br />along Hunter Road. APAI will make recommendations in a Preliminary Engineering Letter Report for any <br />revisions to the proposed improvements based on the results of these reviews. <br />Task 2 — Preliminary Engineering Letter Report - Due to the schedule and the nature of the project, <br />APAI will complete a condensed Preliminary Engineering Phase for this project. APAI will evaluate an <br />alignment located on the southeast side of Hunter Road between Centerpoint and Posey Roads. The <br />evaluation will include the identification of potential conflicts, the need for easements, potential <br />environmental considerations, and an opinion of probable cost. The Letter Report will cover both <br />phases of the project. <br />A -1 <br />