My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-032
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2012 11:04:28 AM
Creation date
4/19/2012 8:44:47 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-32
Date
4/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Design Phase <br />Task 3 — Obtain Design Survey - APAI will obtain a design survey for the portion of the project along <br />Hunter Road between Centerpoint and Posey. The survey will pick up property line information, surface <br />improvements, and contour data. The City will provide the base files for the portion of the project <br />previously designed and that the survey for this area is generally sufficient for design. The Surveyor will <br />spend up to one field day to resolve any issues with the previous survey. If it is determined that the <br />previous design no longer reflects the existing conditions, additional survey beyond one day will be as an <br />additional service. <br />Task 4 - Identify Easements and Prepare Documents - <br />The alignment along Hunter Road will be located in private easements outside the right -of -way. The <br />easement documents for property located south of Posey Road have already been prepared. APAI will <br />obtain easement documents for five tracts of land located north of Posey Road. <br />Task 5 - Obtain Geotechnical Evaluation <br />APAI will obtain a Geotechnical Evaluation of the proposed alignment. The evaluation will include 10 <br />subsurface borings with testing to determine the engineering properties of the material anticipated to <br />be encountered in the trench. <br />Task 6 - Prepare Detailed Design Drawings <br />APAI will prepare detailed plan and profile sheets, details, and general construction notes necessary to <br />convey the intent of the project to prospective contractors. The plans shall include necessary erosion <br />and sedimentation controls, as well as standard traffic control detail sheets. The plan and profile sheets <br />shall be prepared at a horizontal scale of 1" = 20'. APAI will redraw the design for the portion of the <br />project located on Harmons Way and Hunter Road south of Posey Road and make appropriate <br />modifications as necessary. This will include the replacement of the 8 -inch in Harmons Way and the <br />changing of services to this new line. The improvement project will also include milling and overlay <br />details for Harmons Way. The City will be provided with five (5) sets of half -scale drawings and an <br />electronic versioin (pdf) at the 60 and 90 percent stage for review. APAI will provide an electronic (pdf) <br />version of the final, sealed drawings for distribution by the City. It is anticipated that the plan set will <br />include 40 sheets. <br />Task 7 — Prepare Technical Specifications and Bid Form <br />APAI will prepare the technical specifications and bid form for the Contract Manual. The City will <br />prepare the complete Contract Manual and APAI will review the completed manual. <br />A -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.