My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-032
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2012 11:04:28 AM
Creation date
4/19/2012 8:44:47 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-32
Date
4/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT B — PROJECT SCHEDULE <br />APAI will complete the Scope of Work based on the following schedule of deliverables. Design Phase <br />schedules refer to time from receipt of a notice -to- proceed. <br />Preliminary Engineering Letter Report - 4 weeks <br />Draft Easement Documents — 8 weeks <br />Final Easement Documents— 12 weeks <br />60 Percent Drawings —16 weeks <br />90 Percent Drawings with draft manual — 22 weeks <br />Final Sealed Drawings and Manual — 26 weeks <br />Bidding Phase will last three months <br />Construction Phase will last ten months <br />B -1 <br />