My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-032
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2012 11:04:28 AM
Creation date
4/19/2012 8:44:47 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-32
Date
4/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 16 — Respond to Requests for Information <br />APAI will provide responses to Requests for Information (RFI) submitted by the Contractor as necessary <br />to clarify the intent of the construction documents. <br />Task 17 — Assist with Change Orders <br />APAI will assist with preparing change orders as necessary to address changed conditions. <br />Task 18 — Attend Construction Meetings <br />APAI will attend monthly construction meetings as necessary to provide input to the project. It is <br />anticipated that a total of ten (10) meetings will be required. Meetings beyond this number will be <br />considered as an additional service. <br />Task 19 — Periodic Site Visits <br />In addition to the construction meetings, APAI will conduct up to twelve (12) periodic site visits to <br />observe the general progress and character of the construction. This total shall include visits to the <br />construction site in response to requests by the City inspector or the contractor to observe some aspect <br />of the construction. <br />Task 20— Substantial Completion Walk- Through and Punch List <br />Upon receipt of notice from the City inspector that construction is complete, APAI shall attend a final <br />walk- through of the project. APAI will prepare a punch list of items to be addressed by the contractor, <br />and provide a letter to the City that Substantial Completion has been reached prior to acceptance of the <br />project by the City. <br />Task 21— Record Drawings <br />APAI will prepare an electronic copy (pdf format) of the record drawings. The record drawings will be <br />prepared from information provided by the Contractor and the City Inspector concerning changes made <br />in the field. In addition, APAI will provide an electronic copy (AutoCAD format) of the final alignment so <br />that the City can incorporate the improvements into its GIS system. <br />A -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.