Laserfiche WebLink
<br />5. Volatile Suspended Solids <br />6. COD <br />7. Conductivity <br />8. BODs <br />9. Ammonia-nitrogen <br />10. Total Kjeldahl Nitrogen <br />11. Nitrate-nitrogen <br />12. Total Phosphorus <br />13. Total Sulfide <br />14. Sulfate <br />15. Chloride <br />16. Total Alkalinity <br /> <br />Task 1.2 Quality Control Review <br />To confirm the existing plant database and compare laboratory results, samples collected by <br />treatment plant personnel will be split and sent to a private laboratory for analysis for a period of 7 <br />days. Samples from 7 locations within the treatment plant will be split and analyzed: <br /> <br />1. Primary clarifier No.1 and No.2 effluent <br />2. Aeration basin No. 1 and No.2 effluent <br />3. Secondary clarfier No.1 and No.2 effluent <br />4. Final effluent <br /> <br />The samples will be analyzed for the same parameters as listed under Task 1.1. <br /> <br />A daily grab sample of the V.V. facility's influent and effluent will also be taken for the 5 day <br />period. <br /> <br />Task 1.3 Prepare Report <br />The results from the main lift station will be reviewed for consistency, apparent trends, and <br />anomalies in relation to plant operating data. Sample results from the plant lab will be <br />compared with the private lab results for consistency and relative difference. A brief report will <br />be prepared to present findings and conclusions. <br />