Laserfiche WebLink
<br />Temporary tents-over 1,000 sq. ft. <br />Manufactured housing hookup inspection <br />Certificate of occupancy inspection-single tenant space <br />Certificate of occupancy inspection-existing building <br />Foundation repairs/leveling <br />Reinspection fee (3rd and subsequent call backs) <br />Work begun without required permit <br /> <br />Sign Permits: <br />On premise signs up to 100 sq. ft. <br />On premise signs 101-200 sq. ft. <br />On premise signs 201 sq. ft. and larger <br />Off-premise signs/billboards <br /> <br />$50 <br />$35 <br />$25 <br />$50 <br />51t/sq. ft., $25 minimum <br />$25 each <br />Double normal permit fee <br /> <br />25#sq. ft. <br />501t/sq. ft. <br />751t/sq. ft. <br />$250 initial <br />$100 annual renewal <br /> <br />Contractor Licensing: <br />General contractor <br /> <br />Electrician-Journeyman <br /> <br />$150 initial <br />$100/year renewal <br />$25/project <br />$50/yr. local registration <br />$50/yr. local registration <br />$150 initial <br />$75 annual renewal <br />$75 initial <br />$50 annual renewal <br />$50 initial <br />$35 annual renewal <br />$50 initial <br />$35 annual renewal <br />$15 <br />$50 initial <br />$35 annual renewal <br />$50/yr. local registration <br />$50/yr. local registration <br />$50 initial <br />$25 annual renewal <br /> <br />Homeowner project registration <br />Plumber <br />Mechanical contractor <br />Electrician-Master <br /> <br />Electrician-Apprentice <br /> <br />Electrician-Maintenance <br /> <br />Electrician-Letter for reciprocal license <br />General maintenance contractor <br /> <br />Fire sprinkler installer <br />Irrigation system contractor <br />Sign contractor <br /> <br />Replacement license or permit (for lost/damaged) <br /> <br />$25 <br /> <br />SECTION 4. The following fees are set for subdivisions and related development activities <br />under Sections 110.041, 110.044 and 110.045 of the City Code: <br />Inside City Limits: <br />Administrative minor plat <br />Minor plat (Planning & Zoning Commission Review) <br />Subdivision Master Plan <br />Preliminary plat <br />Final plat <br />Plat vacation <br />Edwards Aquifer Recharge Zone review <br />Subdivision variance request <br /> <br />$50/acre, $100 min. <br />$50/acre, $100 min. <br />$250 <br />$30/acre, $250 min. <br />$10/acre, $250 min. <br />$150 <br />$5/acre <br />$75 <br /> <br />Outside City Limits: <br />Administrative minor plat <br />Minor plat (Planning & Zoning Commission Review) <br />Subdivision Master Plan <br />Preliminary plat <br />Final plat <br />Plat vacation <br />Edwards Aquifer Recharge Zone review <br />Subdivision variance request <br /> <br />$62.50/acre, $125 min. <br />$62.50/acre, $125 min. <br />$300 <br />$37.50/acre, $312.50 min. <br />$12.50/acre, $312.50 min. <br />$187.50 <br />$6.25/acre <br />$93.75 <br /> <br />3 <br />