My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-201
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2006 1:28:30 PM
Creation date
9/6/2006 1:28:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1999-201
Date
10/11/1999
Volume Book
138
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />jurisdiction over the Project (including City inspectors) in order to establish construction <br />schedules and to identify key representatives of the parties and lines of communication. <br /> <br />1.6.4 Assist the City in ensuring that all applicable permits and approvals have been <br />obtained from the appropriate agencies prior to construction. <br /> <br />1.6.5 Make on-site inspections of the Project at least weekly to ensure familiarity with the <br />progress and quality of the work, to determine if the work is proceeding in acceptable <br />conformance with the construction contract documents, and to review the work with the <br />City's designated representatives. On the basis of such on-site inspections by the <br />Engineer, the Engineer will keep the City informed of the progress and quality of the work <br />through written status reports and through weekly meetings with the City's representative; <br />and will also be reasonably available to perform site visitations at the specific request of <br />the City by the next business day after a request is made. <br /> <br />1.6.6 Not have control or charge of and will not be responsible for construction means, <br />methods, techniques, sequences or procedures, or for safety precautions and programs <br />in connection with the work, for the acts or omissions of the Contractor, subcontractors or <br />any other persons performing any of the work, or for the failure of any of them to carry out <br />the work in accordance with the construction contract documents unless such acts or <br />omissions are due to the negligence of the Engineer or are acts or omissions under the <br />Engineer's control. However, Engineer will exercise its authority on behalf of City in <br />accordance herewith and particularly during the construction phase so that all work <br />performed by the Contractor results in a Project completed in accordance with the <br />construction contract documents, and during any phase should the Engineer become <br />aware of the Contractor's utilization of means, methods, techniques, sequences and/or <br />procedures of construction which, in Engineer's opinion, will not result in completion of the <br />Project in accordance with the construction contract documents; or which are unsafe, <br />Engineer will immediately inform the City and will take all necessary action which the <br />Engineer is authorized under this Agreement to take to correct the matter. <br /> <br />1.6.7 At all times have access to the work wherever it is in preparation or progress. <br /> <br />1.6.8 Determine the amounts owing to the Contractor based on its on-site professional <br />inspections and on evaluations of the Contractor's applications for payment including <br />comparisons of Contractor's monthly cost reports with its applications for payment, and will <br />make recommendations for payment in these amounts, as provided in the construction <br />contract documents, or take such other appropriate action which the Engineer deems <br />necessary. <br /> <br />1.6.9 Make recommendations for payment that constitute a representation by Engineer <br />to the City, based on the Engineer's on-site inspections as provided in subsection 1.6.5 <br />and on the data comprising the Contractor's application for payment, that the work has <br />progressed to the point indicated; that, to the best of the Engineer's knowledge, information <br />and belief, the quality of the work is in acceptable conformance with the construction <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.