Laserfiche WebLink
<br />contract documents (subject to an evaluation of the work for conformance with the <br />construction contract documents upon substantial completion, subject to the results of any <br />subsequent tests required by or performed under the construction contract documents, <br />subject to minor variations from the construction contract documents correctable prior to <br />completion, and subject to any specific qualifications stated in the Certificate for Payment); <br />and that the Contractor is entitled to payment in the amount certified. However, the <br />issuance of a Certificate for Payment will not be a representation that the Engineer has <br />made any examination to ascertain how and for what purpose the Contractor has used the <br />monies paid by the City. <br /> <br />1.6.10 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Engineer's reasonable opinion, it is necessary or advisable <br />for the proper implementation of the intent of the construction contract documents, and <br />with the approval of the City, the Engineer will have authority to require special inspection <br />or testing of the work in accordance with the provisions of the construction contract <br />documents, whether or not such work is then fabricated, installed or completed. The <br />Engineer will review the work and results of all testing laboratories as required by the <br />construction contract documents. <br /> <br />1.6.11 Review and make all decisions regarding the approval or taking of other <br />appropriate action upon the Contractor's submittals, including but not limited to, shop <br />drawings, product data and samples, schedule of values and progress schedule. Such <br />action will be taken with reasonable promptness, but generally not to exceed 15 days or <br />such period of time as will not cause delay of the Project. <br /> <br />1.6.12 Prepare minor changes in the plans and specifications as directed by the City; and <br />prepare necessary change orders in triplicate originals for approval by the City and <br />execution in accordance with the construction contract documents. Engineer will not issue <br />change orders not previously approved in writing by City, and no course of conduct on the <br />part of Engineer or City will amend, waive or alter this provision. <br /> <br />1.6.13 Conduct professional inspections to determine the dates of substantial completion <br />and final completion for the Project, to evaluate the work for acceptable conformance with <br />the construction contract documents and in light of any subsequent tests performed as <br />described in Subsection 1.6.11 to verify that any minor deviations from the construction <br />contract documents as described in Subsection 1.6.11 have been corrected and that the <br />reasons for any specific qualifications in any and all previous certificates for payment as <br />described in Subsection 1.6.11 hereof are either no longer valid or the condition(s) and/or <br />problem(s) have been corrected; shall receive and review written warranties and related <br />documents required by the construction contract documents and assembled by the <br />Contractor; will issue final certificates for payment or take other appropriate action; and will <br />make a written recommendation to the City regarding City's acceptance of the Project. <br /> <br />1.6.14 Require the submission by the Contractor, and subcontractors performing work on <br />the Project site, of periodic wage rate payment reports and, with the City's assistance, <br /> <br />7 <br />