Laserfiche WebLink
<br />(c) In this Ordinance,"Grantee" shall mean and shall be understood to be <br />PG&E Texas Pipeline, L.P., its general partner(s), limited partner(s), <br />parent, subsidiary and other affiliated entities, successor(s), lessees <br />or assigns, and any individual, corporations or corporation, receiver, <br />or other person or authority owning or operating the PG&E Pipeline <br />System at anytime during the Term hereof. <br /> <br />(d) In this Ordinance,"Agreed Settlement Sum" shall mean and be <br />understood to be Grantee's one time, lump sum payment of money <br />and all other things of value given to and accepted by the City as <br />consideration for the Full and Final Release and Settlement <br />Agreement executed and approved by the City contemporaneously <br />herewith and the rights, permit, and consent granted by this <br />Ordinance for the Term hereof. <br /> <br />Section 3. Maintenance, Operation, Repair, Relocation, Expansion or <br />Removal of PG&E Pipeline System. <br /> <br />The consent and permit granted herein includes all rights and <br />privileges to maintain, operate, improve, enlarge, extend, repair, remove, and <br />relocate any part of the PG&E Pipeline System as may be deemed <br />necessary by Grantee. In the event that Grantee finds it necessary to <br />excavate in any City Rights of Way, Grantee shaH notify the City and shall <br />comply with all then existing City requirements, if any, concerning such <br />excavation and work performed subject to the provisions of Sections 7 and <br />10, and to the extent that such requirements are applicable to other pipelines <br />and facilities similarly situated. Grantee shaH do no permanent injury to any <br />City Rights .of Way nor in any manner unnecessarily disturb or interfere with <br />utility and sewer pipes, lines, conduits, cables, or facilities installed or <br />constructed by the City or by any authorized person or corporation, but no <br />utility and sewer pipes, lines, conduits, cables or facilities shall be so <br />installed as to unnecessarily disturb or interfere with the PG&E Pipeline <br />System. See attached Addendum to Section 3. <br /> <br />Section 4. New Construction. <br /> <br />and Section 3 <br />Subject to the provisions of Section 2(a~bove, should PG&E, during <br />the term of this Ordinance, need to construct or install new pipelines or add <br />new facilities in City Rights Of Way, PG&E shall notify the City and comply <br />with existing City requirements, if any, concerning such construction to the <br />extent applicable to other pipelines and facilities similarly situated, except <br />that no additional payment, other than what as expressly set forth herein, <br /> <br />Consent/Permit Ordinance for San Benito Class Cities <br />Page 3 - VerS.11 <br />October 18,1999 (12:10PM) <br /> <br />PAGE 3 of 10 of <br />EXHIBIT A <br />