Laserfiche WebLink
<br />Attachment A <br />Page 1 of 8 <br /> <br />City of San Marcos <br />Cottonwood Creek Lift Station, <br />Force Main and Interceptor <br /> <br />SCOPE OF SERVICES <br /> <br />A.1. Preliminary Engineering Phase <br /> <br />Upon written authorization to proceed from the City, Freese and Nichols Engineering <br />Inc. (FNI) will perform the following tasks in this phase of work: <br /> <br />1 . Provide project management and coordination of work effort. <br />2. Provide and establish baseline field control for the Contractor <br />3. Attend a one (1) pre-project meeting with City staff. Topics for this meeting will <br />include the following: <br />· Design criteria and guidelines; <br />· Permit requirements; <br />· Constraints, restrictions and specific features unique to this project; <br />Access to site(s) for survey and geotechnical investigation; <br />· Project communication process; <br />Format of report, plans and construction documents; <br />Establish a project schedule; and <br />Obtain reports, topographic maps and other information deemed pertinent to <br />this project. <br />4. Attend four (4) biweekly progress meetings with the City to provide an update report <br />of the progress of the project. <br />5. Review the 1987 Wastewater System Master Plan and incorporate pertinent <br />information into the project. <br />6. Review the 1998 Preliminary Design Report for the Eastside Interceptor Phase II <br />and the IH35 Relief Sewer Extension and incorporate pertinent information into the <br />project. <br />7. Attend one meeting with Centerpoint Road property owners. <br />8. Prepare preliminary alignment map based on the City two foot contour topographic <br />map and alignments developed by City staff and the 1987 Wastewater System <br />Master Plan. <br />9. Prepare and submit four (4) preliminary design reports which will contain the <br />following items: <br />Define the service area for this project and a service period of 5 years and <br />20 years. <br /> <br />C:\TEMP\City of San Marcos Cottonwood Creek 3.wpd <br />