My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-224
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2006 4:47:12 PM
Creation date
9/6/2006 4:46:34 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1999-224
Date
11/8/1999
Volume Book
138
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment A <br />Page 6 of 8 <br /> <br />1 . Submit 60 percent completion of "Issued for Review" documents to the City within <br />45 calendar days upon City authorization to proceed with final design. <br />2. Submit 90 percent completion "Issued for Review" documents to the City within 30 <br />calendar days upon receipt of City comments on the 60% completion "Issued for <br />Bid" documents. <br />3. Submit "Issued for Bid" documents to the City within 15 calendar days upon receipt <br />of City comments on the 90% completion "Issued for Bid" documents. <br /> <br />Bid Phase <br /> <br />1 . Make recommendations to the City for award of construction contract within 7 <br />calendar days upon bid opening. <br /> <br />Construction Phase <br /> <br />1 . Submit the requirements for construction phase quality assurance services within 7 <br />calendar days upon bid opening. <br />2. Submit record drawings to the City within 30 calendar days upon receipt of final <br />record data from the Contractor. The record drawings shall include the following: <br />· One (1) set of reproducible prints of "Record Drawings" <br />· One (1) electronic copy in Microstation ".dgn" format. <br /> <br />A.7 COMPENSATION. BASIC SERVICES <br />LUMP SUM WITH ADDITIONAL WORK BASED ON COST TIMES <br />MULTIPLIER <br /> <br />1. Basic Services: Compensation to FNI forthe Basic Services shall be the lump sum <br />of $209,705. If FNI sees the Scope of Services changing so that additional services <br />are needed, including but not limited to those services described as Additional <br />Services. FN I will notify City for City's approval before proceeding. Additional Services <br />shall be computed based on the Schedule of Charges. Below is the breakdown of our <br />fees based on the phases. <br /> <br />Preliminary Engineering Phase <br />Final Design Phase <br />Bid/Construction Phase <br /> <br />$ 33,420.00 <br />$118,863.00 <br />$ 57.422.00 <br /> <br />$209,705.00 <br /> <br />Total Fee <br /> <br />C:\TEMP\City of San Marcos Cottonwood Creek 3.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.