Laserfiche WebLink
<br />1.3.18 Conduct professional inspections to determine the dates of substantial completion <br />and final completion for the Project, to evaluate the work for acceptable conformance with <br />the construction contract documents and in light of any subsequent tests performed as <br />described in Subsection 1.3.14 to verify that any minor deviations from the construction <br />contract documents as described in Subsection 1.3.14 have been corrected and that the <br />reasons for any specific qualifications in any and all previous certificates for payment as <br />described in Subsection 1.3.14 hereof are either no longer valid or the condition(s) and/or <br />problem(s) have been corrected; shall receive and review written warranties and related <br />documents required by the construction contract documents and assembled by the <br />Contractor; will issue final certificates for payment or take other appropriate action; and will <br />make a written recommendation to the City regarding City's acceptance of the Project. <br /> <br />1.3.19 Require the submission by the Contractor, and subcontractors performing work on <br />the Project site, of periodic wage rate payment reports and, with the City's assistance, <br />verify compliance with federal and state wage rate requirements for the Project as <br />applicable; and notice the City of any noncompliance, or of the failure by the Contractor or <br />subcontractor's to make submissions. <br /> <br />1.3.20 Prepare, or cause to be prepared, and submit to the City a set of reproducible <br />record drawings showing significant changes in the work made during the construction <br />phase. Provide the City with one digital file of the record drawings in Mircrostation design <br />format. <br /> <br />1.3.21 Ensure that all notices and signs required and provided by the City are posted in <br />the appropriate locations at the Project site. <br /> <br />1.3.22 Conduct final inspection with the City and prepare a punch list prior to final <br />acceptance by the City. <br /> <br />1.3.23 Prior to the end of the one year warranty period, review the completed Project with <br />the City and the Contractor and have all deficient items corrected. The extent ofthe duties, <br />responsibilities and limitations of authority of the Engineer as the City's representative <br />during construction will not be modified or extended after the construction contract <br />documents have been authorized by the City to be competitively bid without written consent <br />of the City and the Engineer and with notice to the Contractor. <br /> <br />1.4 ADDITIONAL SERVICES <br /> <br />1.4.1 Since the Engineer's compensation is a fixed fee for Basic Services, including minor <br />deviations from those described in this Agreement, compensation to the Engineer for <br />additional services will only be for substantial deviations from the scope of services <br />described in this Agreement. The Consultant will submit a written estimate of fees to the <br />City and obtain the City's authorization before initiating any additional services. The City <br />may request the Engineer to perform additional services which will include those items <br />specified in Paragraph A.5. of Attachment A to this Agreement. The Engineer will submit <br /> <br />5 <br />