My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-039
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2006 4:06:20 PM
Creation date
9/11/2006 4:05:57 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-39
Date
2/23/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.4.8 Determine the amounts owing to the Contractor based on its on-site professional <br />inspections and on evaluations of the Contractor's applications for payment including <br />comparisons of Contractor's monthly cost reports with its applications for payment, and will <br />make recommendations for payment in these amounts, as provided in the construction <br />contract documents, or take such other appropriate action which the Engineer deems <br />necessary. <br /> <br />1.4.9 Make recommendations for payment that constitute a representation by Engineer to <br />the City, based on the Engineer's on-site inspections as provided in subsection 1.4.5 and <br />on the data comprising the Contractor's application for payment, that the work has <br />progressed to the point indicated; that, to the best of the Engineer's knowledge, information <br />and belief, the quality of the work is in acceptable conformance with the construction <br />contract documents (subject to an evaluation of the work for conformance with the <br />construction contract documents upon substantial completion, subject to the results of any <br />subsequent tests required by or performed under the construction contract documents, <br />subject to minor variations from the construction contract documents correctable prior to <br />completion, and subject to any specific qualifications stated in the Certificate for Payment); <br />and that the Contractor is entitled to payment in the amount certified. However, the <br />issuance of a Certificate for Payment will not be a representation that the Engineer has <br />made any examination to ascertain how and for what purpose the Contractor has used the <br />monies paid by the City. <br /> <br />1.4.10 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Engineer's reasonable opinion, it is necessary or advisable <br />for the pro-per implementation of the intent of the construction contract documents, and <br />with the approval of the City, the Engineer will have authority to require special inspection <br />or testing of the work in accordance with the provisions of the construction contract <br />documents, whether or not such work is then fabricated, installed or completed. The <br />Engineer will review the work and results of all testing laboratories as required by the <br />construction contract documents. <br /> <br />1.4.11 Review and make all decisions regarding the approval or taking of other appropriate <br />action upon the Contractor's submittals, including but not limited to, shop drawings, product <br />data and samples, schedule of values and progress schedule. Such action will be taken <br />with reasonable promptness, but generally not to exceed 15 days or such period of time <br />as will not cause delay of the Project. <br /> <br />1.4.12 Prepare minor changes in the plans and specifications as directed by the City; and <br />prepare necessary change orders in triplicate originals for approval by the City and <br />execution in accordance with the construction contract documents. Engineer will not issue <br />change orders not previously approved in writing by City, and no course of conduct on the <br />part of Engineer or City will amend, waive or alter this provision. <br /> <br />1.4.13 Conduct professional inspections to determine the dates of substantial completion <br />and final completion for the Project, to evaluate the work for acceptable conformance with <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.