My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-039
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2006 4:06:20 PM
Creation date
9/11/2006 4:05:57 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-39
Date
2/23/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the construction contract documents and in light of any subsequent tests performed as <br />described in Subsection 1.4.10 to verify that any minor deviations from the construction <br />contract documents as described in Subsection 1.4.10 have been corrected and that the <br />reasons for any specific qualifications in any and all previous certificates for payment as <br />described in Subsection 1.4.10 hereof are either no longer valid or the condition(s) and/or <br />problem(s) have been corrected; shall receive and review written warranties and related <br />documents required by the construction contract documents and assembled by the <br />Contractor; will issue final certificates for payment or take other appropriate action; and will <br />make a written recommendation to the City regarding City's acceptance of the Project. <br /> <br />1.4.14 Require the submission by the Contractor, and subcontractors performing work on <br />the Project site, of periodic wage rate payment reports and, with the City's assistance, <br />verify compliance with federal and state wage rate requirements for the Project; and notify <br />the City of any noncompliance, or of the failure by the Contractor or subcontractor to make <br />submissions. <br /> <br />1.4.15 Prepare, or cause to be prepared, and submit to the City a set of reproducible <br />record drawings and a set in Microstation digital format, showing significant changes in the <br />work made during the construction phase. <br /> <br />1.4.16 Ensure that all notices and signs required and provided by the City are posted in <br />the appropriate locations at the Project site. <br /> <br />1.4.17 Conduct final inspection with the City and prepare a punch list prior to final <br />acceptance by the City. <br /> <br />1.4.18 Prior to the end of the one year warranty period, review the completed Project with <br />the City and the Contractor and have all deficient items corrected. The extent of the duties, <br />responsibilities and limitations of authority of the Engineer as the City's representative <br />during construction will not be modified or extended after the construction contract <br />documents have been authorized by the City to be competitively bid without written consent <br />of the City and the Engineer and with notice to the Contractor. <br /> <br />1.5 ADDITIONAL SERVICES <br /> <br />1.5.1 Since the Engineer's compensation is a fixed fee for Basic Services, including minor <br />deviations from those described in this Agreement, compensation to the Engineer for <br />additional services will only be for substantial deviations from the scope of services <br />described in this Agreement. The Engineer will submit a written estimate of fees to the City <br />and obtain the City's authorization before initiating any additional services. Additional <br />services include Engineer's attendance at public hearings, Engineer's provision of expert <br />testimony and construction administration beyond construction contract completion. <br /> <br />1.5.2 Each material change (deletion or addition) in the services to be provided by <br />Engineer must be authorized by the City on the Authorization of Change in Services form <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.