My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-042
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2006 4:13:30 PM
Creation date
9/11/2006 4:11:48 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-42
Date
2/23/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3.1.3 Construction cost does not include the compensation of the Engineer and the <br />Engineer's consultants, or other costs which are the responsibility of the City as provided <br />in Article 2. <br /> <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared <br />by the Engineer, will represent the Engineer's judgment to that degree of care and skill <br />ordinarily exercised by a design professional familiar with the construction industry. <br /> <br />3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br />representative after consulting with the Engineer. The Engineer will be permitted to include <br />contingencies for design, bidding and price escalation, to determine what materials, <br />equipment, and types of construction are to be included in the construction contract <br />documents, to make reasonable adjustments in the scope of the Project and to include in <br />the construction contract documents alternate bids to adjust the construction cost to the <br />fixed limit. The fixed limit of construction cost may be increased by the City. <br /> <br />3.2.3 If the lowest bona fide bid exceeds the Engineer's most recent approved opinion of <br />probable construction cost established as a condition of this Agreement, the City will (1) <br />give written approval of an increase in such fixed limit, (2) authorize rebidding of the Project <br />within a reasonable time, or (3) cooperate in revising the Project scope and quality to <br />reduce the construction cost. During the development of the Project through the phases <br />described in Attachment A to this Agreement and prior to the City's final approval of <br />construction contract documents, the Engineer will monitor the established opinion of <br />probable construction cost in relation to the established fixed limit. <br /> <br />If necessary, the Engineer will implement construction cost savings measures or <br />otherwise endeavor to limit probable construction cost to the level of available funds set <br />by the City. <br /> <br />ARTICLE 4 <br />REIMBURSABLE EXPENSES. <br /> <br />4.1 Reimbursable expenses, including such things as expenses for plotting, <br />reproduction of documents (except bid documents), auto travel mileage, delivery charges, <br />long distance communications, and freight are included in the Engineer's basic services <br />compensation. Reimbursable expenses approved by the City in excess of the amounts <br />given in Attachment A are to be charged to the City by the Engineer at actual cost times <br />a multiplier of 1.00 except for subcontractor services which are to be charged to the City <br />by the Engineer at actual cost times a multiplier of 1.05. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.