My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-176
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2007 1:58:33 PM
Creation date
10/18/2006 2:19:42 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-176
Date
10/17/2006
Volume Book
169
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />1.7.25 Prepare minor changes in the plans and specifications as directed by the City; and prepare <br />necessary change orders in triplicate originals for approval by the City and execution in <br />accordance with the construction contract documents. Engineer will not issue change orders not <br />previously approved in writing by City, and no course of conduct on the part of Engineer or City <br />will amend, waive or alter this provision. <br /> <br />1.7.26 Conduct professional inspections to determine the dates of substantial completion and <br />final completion for the Project, to evaluate the work for acceptable conformance with the <br />construction contract documents and in light of any subsequent tests performed as described in <br />Subsection 1.7.17 to verify that any minor deviations from the construction contract documents <br />as described in Subsection 1.7.17 have been corrected and that the reasons for any specific <br />qualifications in any and all previous certificates for payment as described in Subsection 1.7.17 <br />hereof are either no longer valid or the condition(s) and/or problem(s) have been corrected; will <br />receive and review written warranties and related documents required by the construction <br />contract documents and assembled by the Contractor; will issue final certificates for payment or <br />take other appropriate action; and will make a written recommendation to the City regarding <br />City's acceptance of the Project. <br /> <br />1.7.27 Require the submission by the Contractor, and subcontractors performing work on the <br />Project site, of periodic wage rate payment reports and, with the City's assistance, verify <br />compliance with federal and state wage rate requirements for the Project; and notice the City of <br />any noncompliance, or of the failure by the Contractor or subcontractor's to make submissions. <br /> <br />1.7.28 Prepare, or cause to be prepared, and submit to the City a set of reproducible record <br />drawings showing significant changes in the work made during the construction phase. <br /> <br />1.7.29 Ensure that all notices and signs required and provided by the City and TxDOT are posted <br />in the appropriate locations at the Project site by the Contractor. <br /> <br />1.7.30 Conduct final inspection with the City and prepare a punch list prior to final acceptance <br />by the City. <br /> <br />1.7.31 Upon Project completion, the Engineer will issue and sign a "Notification of <br />Completion" acknowledging the Project's construction completion. Within six months after the <br />Project is completed, the Engineer will file with TxDOT and the City a set of as-built plans that <br />are signed, sealed and dated by the Engineer that incorporate any construction revisions. The <br />Engineer will certify that the Project was constructed in accordance with the as-built plans and <br />specifications. <br /> <br />1.7.32 Prior to the end of the one year warranty period, review the completed Project with the <br />City and the Contractor and have all deficient items corrected. The extent of the duties, <br />responsibilities and limitations of authority of the Engineer as the City's representative during <br />construction will not be modified or extended after the construction contract documents have <br />been authorized by the City to be competitively bid without written consent of the City and the <br />Engineer and with notice to the Contractor. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.