<br />ATTACHMENT C <br /> <br />27 <br /> <br />Budget <br /> <br />FM 3407 - Wonder World Drive <br />From Existing RM 12 to Hunter Road <br />Project Length: 3.23 miles <br /> <br />2004 Traffic <br />Project Traffic at Opening Day 2008 <br />2024 Traffic <br />Traffic Increase Rate: ;::::; 600 ADT increase/year <br /> <br />12,000 <br />14,400 <br />23,800 <br /> <br />Pass Through Toll Request <br /> <br /> * * Estimated Cost **PTT Request PTT Allowable <br />PER/Schematic <br />Environmental Assessment 659,094 - <br />Environmental Mitigation 5,124,664 - <br />Project Development Cost 45,574 - <br />Preliminary Engineering 785,033 - <br />GEC/Project Management 1,208,629 1,208,629 500,000 <br />PS&E 4,834,515 4,834,515 4,500,000 <br />ROW 11,850,000 - <br />Construction 43,575,095 43,575,095 *40,500,000 <br />GEC/Program Management <br />(Construction) ] ,307,253 1,307,253 500,000 <br />Construction Management 4,357,510 4,357,510 4,500,000 <br />Total 73,747,367 55,283,002 50,500,000 <br /> <br />* Construction cost based on District 14 estimates. <br />**2006 Estimates <br /> <br />PTT Allowable Project Cost <br />Project Adjustment for Inflation <br />5 years @ 4% ;::::; 20% <br /> <br />$ 50,500,000 <br /> <br />] 0,] 00.000 <br />$ 60,600,000 <br /> <br />TOTAL Reimbursement through PTT <br />$60,600,000 <br /> <br />PTT Rate - 0.15NMT <br /> <br />Minimum Payout - 10 years - Maximum Annual Payment - $6,060,000 <br />Maximum Payout - 20 years - Minimum Annual Payment - $3,030,000 <br /> <br />Estimated Payback - 17.3 years <br /> <br />Attachment C <br /> <br />Page 1 of 1 <br />