My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-183
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 10:53:49 AM
Creation date
11/17/2006 9:25:31 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-183
Date
11/6/2006
Volume Book
170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Minimum Construction Requirement ExD <br />Standard Form, Approved AVP-Law 06/15/2006 <br /> <br />, <br /> <br />BUILDING AMERICA. aI <br /> <br />1.15 CONSTRUCTION AND AS-BUILT SUBMITTALS <br /> <br />A. Submittals are required for construction materials and procedures as outlined below. The submittals shall include all review <br />comments from the Agency and the Engineer of Record. All design submittals shall be stamped and signed by a Professional <br />Engineer registered in the State of Texas <br /> <br />8, The tables below provide UPRR's minimum submittal requirements for the construction items noted. Submittal <br />requirements are in addition to those specified elsewhere in these bid documents. The minimum review times indicated below <br />represent UPRR's requirements only. The Contractor shall allow additional time for the Agency's review time as stated <br />elsewhere in these bid documents. <br /> <br />C. Submittals shall be made by the Agency to the UPRR Manager of Industry and Public Projects unless otherwise directed by <br />the Railroad. Items in Table 1 shall be submitted for both railroad overpass and underpass projects, as applicable. Items in <br />Table 2 shall be submitted for railroad underpass projects only <br /> <br />TABLE 1 <br /> <br />ITEM DESCRIPTION SETS UPRR's Minimum Review <br />REQD Time <br />1 Shorina desian and details 4 4 weeks <br />2 Falsework desian and details 4 4 weeks <br />3 Drainaae desian provisions 4 4 weeks <br />4 Erection diaarams and seauence 4 4 weeks <br />5 Demolition diaaram and seauence 4 4 weeks <br /> <br />Prior to or durina construction of railroad underpass structures. the UPRR reauires the review of drawinas. reDorts. <br />test data and material data sheets to determine compliance with the specifications. Product information for items <br />noted in Table 2 be submitted to UPRR's Desianated Representative throuah the Aaencv for their own review and <br />approval of the material. The sianed submittal and the Aaencv's review comments will be reviewed bv UPRR or their <br />consultant. If a consultant performs the reviews. the consultant may replv directlv to the Aaencv or its Desianated <br />Representative after consultation with UPRR. Review of the submittals will not be conducted until after review bY the <br />Aaencv or its Desianated Representative. Review of the submittal items will reauire a minimum of four (4) weeks after <br />receipt from the Aaencv. <br /> <br />TABLE 2 <br /> <br />ITEM DESCRIPTION SETS NOTES <br />REQD_ <br />1 Shop drawinas 4 Steel and Concrete members <br />2 Bearinas 4 For all structures <br />3 Concrete Mix Desians 4 For all structures <br />4 Rebar & Strand certifications 4 For superstructure only <br />5 28 dav concrete strenath 4 For superstructure only <br /> Waterproofing material <br />6 certifications and installation 4 Waterproofing & protective boards <br /> procedure <br /> All fracture critical members & other <br />7 Structural steel certifications 4 members requiring improved notch <br /> touahness <br /> All fracture critical members & other <br />8 Fabrication and Test reports 4 members requiring improved notch <br /> touQhness <br />9 Welding Procedures and 4 AWS requirements <br />Welder Certification <br /> Foundation Construction Pile driving, drilled shaft <br />10 Reports 4 construction, bearing pressure test <br /> reports for spread footinas <br /> Compaction testing reports for Must meet 95% maximum dry <br />11 4 density, Modified Proctor ASTM <br /> backfill at abutments D1557 <br /> <br />D. As-Built Records shall be submitted to the UPRR within 60 days of completion of the structures These records shall <br />consist of the following items: <br /> <br />Minimum Construction Requirement ExD <br />Standard Form, Approved A VP-Law 06/15/2006 <br /> <br />Page 4 of 6 <br /> <br />Exhibit D <br />Minimum Construction Requirements <br />To Public Road Crossing Developers Overpass Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.