<br />Minimum Construction Requirement ExD
<br />Standard Form, Approved AVP-Law 06/15/2006
<br />
<br />,
<br />Overoass Proiects
<br />
<br />1. Electronic files of all structure design drawings with as-constructed modifications shown, in Microstation J or Acrobat
<br />PDF format.
<br />2, Hard copies of all structure design drawings with as-constructed modifications shown_
<br />
<br />BUILDING AMERICA- ~
<br />
<br />Underoass Proiects
<br />
<br />Electronic files of all structure design drawings with as-constructed modifications shown, in Microstation SE or Acrobat
<br />.PDF format.
<br />2, Hard copies of all structure design drawings with as-constructed modifications shown,
<br />3 Final approved copies of shop drawings for concrete and steel members,
<br />4. Foundation Construction Reports
<br />5. Compaction testing reports for backfill at abutments
<br />
<br />1.16 APPROVAL OF DETAILS
<br />
<br />The details of the construction affecting the UPRR tracks and property not already included in the Contract Plans shall be
<br />submitted to UPRR's Designated Representative through the Agency for UPRR's review and written approval before such work
<br />is undertaken, Review and approval of these submittals will require a minimum of four (4) weeks in addition to the Agency's
<br />review time as stated elsewhere in these bid documents,
<br />
<br />1.17 MAINTENANCE OF RAILROAD FACILITIES
<br />
<br />A. The Contractor shall be required to maintain all ditches and drainage structures free of silt or other obstructions which may
<br />result from Contractor's operations; to promptly repair eroded areas within UPRR's right of way and to repair any other damage
<br />to the property of UPRR, or its tenants.
<br />
<br />B, All such maintenance and repair of damages due to the Contractor's operations shall be done at the Contractor's expense.
<br />
<br />C, The Contractor must submit a proposed method of erosion control and have the method reviewed by the UPRR prior to
<br />beginning any grading on the Project Site. Erosion control methods must comply with all applicable local, state and federal
<br />regulations.
<br />
<br />1.18 SITE INSPECTIONS BY UPRR's DESIGNATED REPRESENTATIVE
<br />
<br />A. In addition to the office reviews of construction submittals, site inspections may be performed by UPRR's Designated
<br />Representative at significant points during construction, including the following if applicable:
<br />
<br />1 Pre-construction meetings,
<br />2. Pile driving/drilling of caissons or drilled shafts,
<br />3, Reinforcement and concrete placement for railroad bridge substructure and/or superstructure,
<br />4, Erection of precast concrete or steel bridge superstructure.
<br />5. Placement of waterproofing (prior to placing ballast on bridge deck).
<br />6, Completion of the bridge structure,
<br />
<br />B. Site inspection is not limited to the milestone events listed above, Site visits to check progress of the work may be
<br />performed at any time throughout the construction as deemed necessary by UPRR.
<br />
<br />C, A detailed construction schedule, including the proposed temporary horizontal and vertical clearances and construction
<br />sequence for all work to be performed, shall be provided to the Agency for submittal to UPRR's Designated Representative for
<br />review prior to commencement of work, This schedule shall also include the anticipated dates when the above listed events will
<br />occur. This schedule shall be updated for the above listed events as necessary, but at least monthly so that site visits may be
<br />scheduled.
<br />
<br />1.19 UPRR REPRESENTATIVES
<br />
<br />A. UPRR representatives, conductors, flag person or watch person will be provided by UPRR at expense of the Agency or
<br />Contractor (as stated elsewhere in these bid documents) to protect UPRR facilities, property and movements of its trains or
<br />engines In general, UPRR will furnish such personnel or other protective services as follows'
<br />
<br />B. When any part of any equipment is standing or being operated within 25 feet, measured horizontally, from centerline of any
<br />track on which trains may operate, or when any object is off the ground and any dimension thereof could extend inside the 25
<br />foot limit, or when any erection or construction activities are in progress within such limits, regardless of elevation above or
<br />below track,
<br />
<br />C, For any excavation below elevation of track subgrade if, in the opinion of UPRR's Designated Representative, track or other
<br />UPRR facilities may be subject to settlement or movement.
<br />
<br />D During any clearing, grubbing, excavation or grading in proximity to UPRR facilities, which, in the opinion of UPRR's
<br />
<br />Minimum Construction Requirement ExD
<br />Standard Form, Approved AVP-Law 06/15/2006
<br />
<br />Page 5 of 6
<br />
<br />Exhibit D
<br />Minimum Construction Requirements
<br />To Public Road Crossing Developers Overpass Agreement
<br />
|