Laserfiche WebLink
<br />Minimum Construction Requirement ExD <br />Standard Form, Approved AVP-Law 06/15/2006 <br />, <br /> <br />BUILDING AMERICA'" <<1ft; <br /> <br />Designated Representative, may endanger UPRR facilities or operations <br /> <br />E. During any contractor's operations when, in the opinion of UPRR's Designated Representative, UPRR facilities, including, <br />but not limited to, tracks, buildings, signals, wire lines, or pipe lines, may be endangered <br /> <br />F The Contractor shall arrange with the UPRR Designated Representative to provide the adequate number of flag persons to <br />accomplish the work, <br /> <br />1.20 WALKWAYS REQUIRED <br /> <br />Along the outer side of each exterior track of multiple operated track, and on each side of single operated track, an <br />unobstructed continuous space suitable for trainman's use in walking along trains, extending to a line not less than twelve feet <br />(12') from centerline of track, shall be maintained. Any temporary impediments to walkways and track drainage encroachments <br />or obstructions allowed during work hours while UPRR's flagman service is provided shall be removed before the close of each <br />work day, Walkways with railings shall be constructed by Contractor over open excavation areas when in close proximity of <br />track, and railings shall not be closer than 8' - 6" horizontally from center line of tangent track or 9' - 6" horizontal from curved <br />track, <br /> <br />1.21 COMMUNICATIONS AND SIGNAL LINES <br /> <br />If required, UPRR will rearrange its communications and signal lines, its grade crossing warning devices, train signals and <br />tracks, and facilities that are in use and maintained by UPRR's forces in connection with its operation at expense of the Agency. <br />This work by UPRR will be done by its own forces and it is not a part of the Work under this Contract. <br /> <br />1.22 TRAFFIC CONTROL <br /> <br />Contractor's operations that control traffic across or around UPRR facilities shall be coordinated with and approved by the <br />UPRR's Designated Representative. <br /> <br />1.23 CONSTRUCTION EXCAVATIONS <br /> <br />A. The Contractor shall be required to take special precaution and care in connection with excavating and shoring. <br />Excavations for construction of footings, piers, columns, walls or other facilities that require shoring shall comply with <br />requirements of OSHA, AREMA and UPRR "Guidelines for Temporary Shoring" <br /> <br />B, The Contractor shall contact UPRR's "Call Before Your Dig" at least 48 hours prior to commencing work at 1-800-336-9193 <br />during normal business hours (6:30 a,m. to 8:00 pm. central time, Monday through Friday, except holidays - also a 24 hour, 7 <br />day a week number for emergency calls) to determine location of fiber optics. If a telecommunications system is buried <br />anywhere on or near UPRR property, the Contractor will co-ordinate with UPRR and the Telecommunication Company(ies) to <br />arrange for relocation or other protection of the system prior to beginning any work on or near UPRR property, <br /> <br />1.24 RAILROAD FLAGGING <br /> <br />Performance of any work by the Contractor in which person(s) or equipment will be within twenty-five (25) feet of any track, <br />or will be near enough to any track that any equipment extension (such as, but not limited to, a crane boom) will reach within <br />twenty-five (25) feet of any track, may require railroad flagging services or other protective measures_ Contractor shall give the <br />advance notice to the UPRR as required in the "Contractor's Right of Entry Agreement" before commencing any such work, so <br />that the UPRR may determine the need for flagging or other protective measures to ensure the safety of the railroad's <br />operations. Contractor shall comply with all other requirements regarding flagging services covered by the "Contractor's Right of <br />Entry Agreement". Any costs associated with failure to abide by these requirements will be borne by the Contractor. <br /> <br />The estimated pay rate for each flag person is $700.00 per day for an B hour work day with time and one-half for <br />overtime, Saturdays, Sundays; double time and one-half for holidays. Flagging rates are set by the UPRR and are <br />subject to change. <br /> <br />1.25 CLEANING OF RIGHT-OF-WAY <br /> <br />Contractor shall, upon completion of the work to be performed by Contractor upon the premises, over or beneath the tracks <br />of UPRR, promptly remove from the right-of-way of UPRR all of Contractor's tools, implements, and other materials whether <br />brought upon the right-of-way by Contractor or any subcontractors, employee or agent of Contractor or of any subcontractor, <br />and leave the right-of-way in a clean and presentable condition to satisfaction of UPRR <br /> <br />Minimum Construction Requirement ExD <br />Standard Form, Approved AVP-Law 06/15/2006 <br /> <br />Page 6 of 6 <br /> <br />Exhibit D <br />Minimum Construction Requirements <br />To Public Road Crossing Developers Overpass Agreement <br />