My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-095
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2012 10:22:32 AM
Creation date
8/9/2012 4:03:45 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-95
Date
8/7/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TESTINGIOBSERVATION ITEM <br />UNITCOST <br />UNIT <br />ESTIMATED <br />QUANTITY <br />COST <br />EXTENSION <br />ADDITIONAL ALTERNATE BID A - UU DRIVE <br />(HOPKINS TO HUTCHINSON) <br />SOILS <br />Laboratory Testis <br />Moisture Density Relationshipj TxDOT or ASTM <br />$350.00 <br />each <br />3 <br />$1050.00 <br />includes Atterberg Limits and Sieve Analysis) <br />Field Testing/ Observation <br />In -Place Nuclear Densities <br />$10.00 <br />each <br />182 <br />$1,820.00 <br />Materials Technician <br />542.00 <br />hour <br />ISO <br />56 300.00 <br />Vehicle Travel Charge <br />$60.00 <br />trip <br />30 <br />$1,800.00 <br />Subtotal <br />$10,970.00 <br />CONCRETE <br />Laboratory Testis <br />Concrete Compressive Strength C lnders <br />$10.00 <br />each <br />32 <br />$320.00 <br />Field Testis Observation <br />Materials Technician <br />$42.00 <br />hour <br />64 <br />$2688.00 <br />Materials Technician overtime <br />SSS.00 <br />Four <br />6 <br />$330.00 <br />Vehicle Travel Charge <br />560.00 <br />trip <br />10 <br />$600.00 <br />Subtotal <br />$3,938.00 <br />ASPHALT <br />Laboratory Testis <br />Bag Sample Extraction Gradation C content <br />5340.00 <br />each <br />7 <br />$2,380.00 <br />Molding Specimens, Laborato Densk of Molded <br />Specimens, Stability Test Hveem Maximum <br />Theoretical spasific Gravit <br />Density of Asphalt Cores <br />$80.0D <br />each <br />IS <br />$1200.00 <br />Field Testis Observation <br />Materials Technician <br />$42.00 <br />hour <br />30 <br />$1260.00 <br />Vehicle Travel Charge <br />$60.00 <br />trip <br />G <br />$360.00 <br />Subtotal <br />5 200.00 <br />PROJECT ADMINISTRATION <br />Project Coordinator <br />$65.00 <br />Four <br />3 <br />$195.00 <br />Pra tEngineer <br />$150.00 <br />hour <br />0 <br />50.00 <br />Subtotal <br />195.00 <br />Reporting and Report Distribution <br />1096 of total cost <br />$2,030.30 <br />SUBTOTAL ALTERNATE A <br />$22,333.30 <br />ADDITIONAL ALTERNATE BID B - CM ALIEN PARKWAY <br />ASPHALT <br />Laboratory TesUn <br />Bag Sample Extraction Gradation Ccontent <br />$340.00 <br />each <br />4 <br />$1,360.00 <br />Mottling Specimens, Laboratory Density of Molded <br />Specimens, Stability Test Hveem Maximum <br />Theoretical spasific Gravity) <br />Density of Asphalt Cares <br />$80.00 <br />each <br />4 <br />$320.00 <br />Field Testis Observation <br />Materials Technician <br />2.00 <br />hour <br />10 <br />420.00 <br />Vehicle Travel Charge <br />$60.00 <br />trip <br />2 <br />$120.00 <br />Subtotal <br />$2,220.00 <br />PROJECT ADMINISTRATION <br />Project Coordinator <br />$65.00 <br />Maur <br />1 2 <br />$130.00 <br />Project Engineer g <br />$150.00 <br />hour <br />0 <br />$0.00 <br />Subtotal <br />130.00 <br />Reporting and Report Distribution <br />1056 of total cost <br />$235.00 <br />SUBTOTAL ALTERNATE 8 <br />2385.00 <br />GRAND TOTAL <br />1 $96,910.00 <br />ENVIRONMENTAL SERVICES ALLOWANCE: $6,000 <br />' Sampling and consuitallon time will be invoiced parr attached Environmental Services Unit Pricing Schedule <br />R A B A K I S T N E R <br />
The URL can be used to link to this page
Your browser does not support the video tag.