Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />that the Architect has made any examination to ascertain how and for what purpose the <br />Contractor has used the monies paid by the City. <br /> <br />1.4.15 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Architect's reasonable opinion, it is necessary or advisable for the <br />proper implementation of the intent of the construction contract documents, and with the <br />approval of the City, the Architect will have authority to require special inspection or testing of <br />the work in accordance with the provisions of the construction contract documents, whether or <br />not such work is then fabricated, installed or completed. The Architect will review the work and <br />results of all testing laboratories as required by the construction contract documents. <br /> <br />1.4,16 Review and make all decisions regarding the approval or taking of other appropriate <br />action upon the Contractor's submittals, including but not limited to, shop drawings, product data <br />and samples, schedule of values and progress schedule. Such action will be taken with <br />reasonable promptness, but generally not to exceed 15 days or such period of time as will not <br />cause delay of the Project. <br /> <br />1.4.17 Prepare minor changes in the plans and specifications as directed by the City; and prepare <br />necessary change orders in triplicate originals for approval by the City and execution in <br />accordance with the construction contract documents. Architect will not issue change orders not <br />previously approved in writing by City, and no course of conduct on the part of Architect or City <br />will amend, waive or alter this provision. <br /> <br />1.4.18 Conduct professional inspections to determine the dates of substantial completion and <br />final completion for the Project, to evaluate the work for acceptable conformance with the <br />construction contract documents and in light of any subsequent tests performed as described in <br />Subsection 1.4.14 to verify that any minor deviations from the construction contract documents <br />as described in Subsection 1.4.14 have been corrected and that the reasons for any specific <br />qualifications in any and all previous certificates for payment as described in Subsection 1.4.14 <br />hereof are either no longer valid or the condition(s) and/or problem(s) have been corrected; shall <br />receive and review written warranties and related documents required by the construction <br />contract documents and assembled by the Contractor; will issue final certificates for payment or <br />take other appropriate action; and will make a written recommendation to the City regarding <br />City's acceptance of the Project. <br /> <br />1.4.19 Assist the City in requiring the submission by the Contractor, and subcontractors <br />performing work on the Project site, of periodic wage rate payment reports and, assist the City in <br />verifying compliance with federal and state wage rate requirements for the Project; and provide <br />notice to the City of any noncompliance, or of the failure by the Contractor or subcontractor's to <br />make submissions as may be required. <br /> <br />1.4.20 Prepare, or cause to be prepared, and submit to the City a set of reproducible record <br />drawings showing significant changes in the work made during the construction phase. <br /> <br />6 <br />